Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.30 | Average TEU per month: 0.67 |
Active Months: 4 | Average TEU per Shipment: 1.33 |
Shipment Frequency Std. Dev.: 0.73 |
Company Name | Shipments |
---|---|
LLOYD ENGINEERING | 6 shipments |
M LLOYD ENGINEERING LTD | 1 shipments |
HS Code | Shipments |
---|---|
843141 Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430 : Machinery parts; buckets, shovels, grabs and grips, for the machinery of heading no. 8426 and 8430 | 2 shipments |
842832 Lifting, handling, loading or unloading machinery; n.e.c. in heading no. 8425, 8426 or 8427 (e.g. lifts, escalators, conveyors, teleferics) : Elevators and conveyors; continuous-action, for goods or materials, bucket type, n.e.c. in item no. 8428.20 or 8428.31 | 1 shipments |
851490 Industrial or laboratory electric furnaces and ovens (including those functioning by induction or dielectric loss); other industrial or laboratory equipment for the heat treatment of materials by induction or dielectric loss : Furnaces, ovens and heating equipment; parts of the industrial or laboratory equipment of heading no. 8514 | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-07-08 | WGEIUOE24050201 | LLOYD ENGINEERING | 10280.0 kg | 842832 | SCREENING BUCKET |
2024-02-22 | WGEIUOE24010173 | LLOYD ENGINEERING | 1134.0 kg | STARS | |
2024-02-22 | WGEIUOE24020024 | LLOYD ENGINEERING | 2765.0 kg | STARS | |
2024-02-22 | WGEIUOE24020023 | LLOYD ENGINEERING | 820.0 kg | STARS | |
2023-10-19 | WGEIUOE23090062 | LLOYD ENGINEERING | 2760.0 kg | 843141 | EXCAVATOR BUCKETS & PARTS |
2023-08-22 | WGEIUOE23070205 | LLOYD ENGINEERING | 8060.0 kg | 843141 | EXCAVATOR BUCKETS & PARTS |
2021-09-29 | NAQAMNYC1718167V | M LLOYD ENGINEERING LTD | 1250.0 kg | 851490 | DUMPER PARTS |
522 SOUTH HOOP POLE ROAD |
---|