Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.08 | Average TEU per month: 0.51 |
Active Months: 1 | Average TEU per Shipment: 6.07 |
Shipment Frequency Std. Dev.: 0.29 |
Company Name | Shipments |
---|---|
OVERSEAS CONTAINER LOGISTICS OCL | 1 shipments |
HS Code | Shipments |
---|---|
760200 Aluminium; waste and scrap : Aluminium; waste and scrap | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-11-28 | MEDUVC699695 | OVERSEAS CONTAINER LOGISTICS OCL | 78000.0 kg | 760200 | CONCRETE WATERPROOFING - / PIECES3,200 PIECESOF CONCRETE WATERPROOFING MATERIALS (NON-HAZ ARDOUS) CONCRETE WATERPROOFING - / PIECES3,200 PIECESOF CONCRETE WATERPROOFING MATERIALS (NON-HAZ ARDOUS) LC NUMBER:ILCSA018343 DATE OF ISSUE: 241024 LC ISSUING BANK: THE SAUDI INVESTMENT BANK CERS: SC2939202411203938908 SHIPPING LINE / SHIPPING AGENT IS ELIGIBLE UNDER THIS B/LTERMS, AS AGREED, TO COLLECT ANY CHARGES OR FEES DEEMED NECESSARY SUCH AS, BUT NOT LIMITED TO, LOLO 65.00 SAR / CONTAINER, LDPP 85.00 SAR / DRY CONTAINER, SAUDI EDI 30.00 SAR / BILL OF LADING, ELECTRICITY CHARGES 200.00 SAR / REEFER CONTAINER, OCC 300.00 SAR / 20FT CONTAINER, OCC 450.00 SAR / 40FT CONTAINER, OCC 560.00 SAR / 45FT CONTAINER & SPECIAL EQUIPMENT, DRY CONTAINER DEPOSIT 3,000.00 SAR / DRY CONTAINER, REEFER CONTAINER DEPOSIT 7,000.00 SAR / REEFER CONTAINER, GATE HANDLING FEE 120.00 SAR / CONTAINER, SADAD FEE 7.50 SAR / INVOICE. CONCRETE WATERPROOFING - / PIECES3,200 PIECESOF CONCRETE WATERPROOFING MATERIALS (NON-HAZ ARDOUS) |