Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.25 | Average TEU per month: 0.71 |
Active Months: 4 | Average TEU per Shipment: 2.12 |
Shipment Frequency Std. Dev.: 0.45 |
Company Name | Shipments |
---|---|
LIAONING HECHUANG CV PARTS MFG CO LTD | 2 shipments |
SICHUAN KALEVEI TECHNOLOGY CO LTD | 2 shipments |
DONGYING WANHE RUBBER & PLASTIC CO | 1 shipments |
LIAONING HECHUANG CV PARTS MFG CO | 1 shipments |
SICHUAN KALEVEI TECHNOLOGY C | 1 shipments |
SICHUAN KALEVEI TECHNOLOGY CO | 1 shipments |
YINGKOU TONGGUANG AUTOMOTIVE | 1 shipments |
HS Code | Shipments |
---|---|
401140 New pneumatic tyres, of rubber : Rubber; new pneumatic tyres, of a kind used on motorcycles | 4 shipments |
391740 Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics : Plastics; tube, pipe and hose fittings (e.g. joints, elbows, flanges) | 1 shipments |
400610 Unvulcanised rubber in other forms (e.g. rods, tubes and profile shapes) and articles (e.g. discs and rings) : Rubber; unvulcanised, camel-back strips for retreading rubber tyres | 1 shipments |
401290 Retreaded or used pneumatic tyres of rubber; solid or cushion tyres, tyre treads and tyre flaps, of rubber : Rubber; tyres n.e.c. in heading no. 4012 | 1 shipments |
611512 Hosiery; panty hose, tights, stockings, socks and other hosiery, including graduated compression hosiery (for example, stockings for varicose veins) and footwear without applied soles, knitted or crocheted | 1 shipments |
741521 Copper, nails, tacks, drawing pins, staples (not those of heading no. 8305) and the like, of copper or iron or steel with heads of copper; screws bolts, nuts, screws hooks, rivets, cotters, washers : Copper; washers, (including spring washers), not threaded | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-04-11 | TXSL2GI03038SC | SICHUAN KALEVEI TECHNOLOGY C | 15314.0 kg | 401140 | NEW TIRES |
2024-03-01 | PPILQ24010041 | SICHUAN KALEVEI TECHNOLOGY CO LTD | 15904.0 kg | 401140 | NEW TIRES |
2023-11-29 | HNLTDL23Q00187 | LIAONING HECHUANG CV PARTS MFG CO LTD | 21440.0 kg | 391740 | BRAKE SHOE THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS |
2023-09-10 | PRIM2GH08148 | LIAONING HECHUANG CV PARTS MFG CO | 39845.0 kg | 401290 | BRAKE DRUM WHEEL RIM BRAKE DRUM WHEEL RIM |
2023-05-04 | PPILQ23030608 | SICHUAN KALEVEI TECHNOLOGY CO LTD | 51070.0 kg | 401140 | NEW TIRES AND TIRE CHAIN NEW TIRES AND TIRE CHAIN |
2023-01-31 | QZIDQDZF22120934 | LIAONING HECHUANG CV PARTS MFG CO LTD | 41034.0 kg | 741521 | BRAKE DRUM SPRING KEEPER BRAKE DRUM SPRING KEEPER |
2022-12-29 | QZIDQDZF22120116 | SICHUAN KALEVEI TECHNOLOGY CO | 31828.0 kg | 401140 | NEW TIRES NEW TIRES |
2021-08-29 | SHPT22713427 | YINGKOU TONGGUANG AUTOMOTIVE | 1266.0 kg | 400610 | TRUCK TYRE CHANGER T568 |
2021-02-11 | MLILMSE21011502 | DONGYING WANHE RUBBER & PLASTIC CO | 1840.0 kg | 611512 | RUBBER HOSE |