Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.33 | Average TEU per month: 0.58 |
Active Months: 4 | Average TEU per Shipment: 1.40 |
Shipment Frequency Std. Dev.: 0.62 |
Company Name | Shipments |
---|---|
QINGDAO WANLONG TIRE TECHNOLOGY CO | 3 shipments |
QINGDAO WANLONG TIRE | 2 shipments |
HS Code | Shipments |
---|---|
842612 Derricks, cranes, including cable cranes, mobile lifting frames, straddle carriers and works trucks fitted with a crane : Cranes; mobile lifting frames on tyres and straddle carriers | 2 shipments |
251820 Dolomite, whether or not calcined or sintered; including dolomite roughly trimmed, or merely cut by sawing or otherwise into blocks or slabs of rectangular (including square) shape; dolomite ramming mix : Dolomite, calcined or sintered; including dolomite roughly trimmed, or merely cut by sawing or otherwise into blocks or slabs of rectangular (including square) shape | 1 shipments |
401212 Retreaded or used pneumatic tyres of rubber; solid or cushion tyres, tyre treads and tyre flaps, of rubber : Retreaded tyres; of a kind used on motor buses or lorries | 1 shipments |
590500 Textile wall coverings : Textile wall coverings of fabrics impregnated, coated, covered or laminated | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-12-02 | TXSL2GJ10A94SC | QINGDAO WANLONG TIRE TECHNOLOGY CO | 15140.0 kg | 401212 | CHRISTMAS LIGHT 9405499000 TIRES 4011200090 |
2024-10-20 | QIQCMRH24090504 | QINGDAO WANLONG TIRE TECHNOLOGY CO | 23696.0 kg | 251820 | TIRES SINTERED STONE PVC PU TRIM |
2024-09-19 | PRIM2GJ09059SC | QINGDAO WANLONG TIRE | 15940.0 kg | 842612 | TIRES |
2024-09-19 | PRIM2GJ09060SC | QINGDAO WANLONG TIRE | 16040.0 kg | 842612 | TIRES |
2024-06-12 | TXSL2GJ04796SC | QINGDAO WANLONG TIRE TECHNOLOGY CO | 15820.0 kg | 590500 | TIRES WPC WALL PANEL |
4582 BELL ROAD ABBOTSFORD VANCOUVE R V5K 1K5 CA |
---|