Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
RUIAN HUADONG PACKING MACHINERY CO | 1 shipments |
ZHEJIANG L AND B MACHINERY CO LTD | 1 shipments |
HS Code | Shipments |
---|---|
848390 Transmission shafts (including cam and crank) and cranks; bearing housings and plain shaft bearings; gears and gearing; ball or roller screws; gear boxes and other speed changers; flywheels and pulleys; clutches and shaft couplings : Transmission components; toothed wheels, chain sprockets and other transmission elements presented separately; parts | 1 shipments |
851240 Lighting or visual signalling equipment (excluding articles of heading no. 8539), windscreen wipers, defrosters and demisters; electrical, of a kind used for cycles or motor vehicles : Windscreen wipers, defrosters and demisters; electrical, of kinds used for cycles or motor vehicles | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-07-24 | SHPT29669522 | RUIAN HUADONG PACKING MACHINERY CO | 2500.0 kg | 848390 | AUTOMATIC SHRINK PACKING MACHINE WF 420 SPARE PARTS OF SHRINK PACKING MACHINE HD 400 ROLLER BELT CHAIN WHEE MOTOR TEMPERATURE CONTROLLER HEATER SEALING BAR RELAY PUNCHING WHEEL PROXIMITY SWITCH THERMO COUPLING CHUKOH TAPE SWITCHING POWER SPEED CONTROLLER TUNNEL TUBE |
2023-04-24 | PEVHNBUC23030732 | ZHEJIANG L AND B MACHINERY CO LTD | 4273.0 kg | 851240 | MOTOR 45KW, 4P MOTOR 37KW, 4P MOTOR 30KW, 4P MOTOR 15KW, 4P MOTOR 5.5KW, 2P MOTOR 4KW, 2P MOTOR 2.2KW, 2P MOTOR 22KW, 4P MOTOR 18.5 KW, 4P MOTOR 11KW, 4P MOTOR 7.5KW, 4P MOTO R 2.2KW, 4P MOTOR 0.75KW, 4P MOTOR 5.5KW, 4 P MOTOR 0.55KW, 4P HIGH SHEAR PUMP PARTS |
11910 SHILOH RD DALLAS TX 75228 US |
---|