Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
ELECNOR SERVICIOS Y PROYECTOS S A | 3 shipments |
HS Code | Shipments |
---|---|
200570 Vegetables preparations n.e.c.; prepared or preserved otherwise than by vinegar or acetic acid, not frozen, other than products of heading no. 2006 : Vegetable preparations; olives, prepared or preserved otherwise than by vinegar or acetic acid, not frozen | 1 shipments |
842119 Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases : Centrifuges; n.e.c. in heading no. 8421, including centrifugal dryers (but not clothes-dryers) | 1 shipments |
853529 Electrical apparatus for switching, protecting electrical circuits, for making connections to or in electrical circuits; for a voltage exceeding 1000 volts : Electrical apparatus; automatic circuit breakers, for a voltage of 72.5kV or more | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-09-16 | MAEU230257404 | ELECNOR SERVICIOS Y PROYECTOS S A | 2011.72 kg | 200570 | CONDUCTORES ELECTRICOS, ACCESO RIOS PL LAMI-017, BECE-019 PROJECT LOTE NO.1 AMPLIACION SUBESTACION ELECTRICA MIRAFLO RES 138-13.8 KV, 50 MVA. AMPLI ACION SUBESTACION ELECTRICA LA INEZ 138-13.8 KV, 50 MVA. Y CO NSTRUCCION DE LINEA DE TRANSMI SION TERNA SENCILLA EN 138 KV ENTRE LAS SUBESTACIONES ELECTR ICAS MIRAFLORES-LAINEZ LOTE N O. 2 AMPLIACION SUBESTACION EL ECTRICA BELLAVISTA EN 138-13.8 KV, 50 MVA. CONSTRUCCION SUBE STACION ELECTRICA EL CENTRO 13 8-13.8 IW., 50 MVA. Y CONSTRUC CION DE LINEA DE TRANSMISION T ERNA SENCILLA EN 138KV ENTRE L AS SUBESTACIONES ELECTRICAS BE LLAVISTA Y EL CENTRO |
2023-09-16 | MAEU230149433 | ELECNOR SERVICIOS Y PROYECTOS S A | 12024.94 kg | 853529 | CARGADORES Y BANCOS DE BATERIA S, EQUIPO AUXILIAR PL: BECE-0 16, LAMI-015 PROJECT LOTE NO .1 AMPLIACION SUBESTACION ELEC TRICA MIRAFLORES 138-13.8 KV, 50 MVA. AMPLIACION SUBESTACION ELECTRICA LAINEZ 138-13.8 KV, 50 MVA. Y CONSTRUCCION DE LIN EA DE TRANSMISION TERNA SENCIL LA EN 138 KV ENTRE LAS SUBESTA CIONES ELECTRICAS MIRAFLORES-L AINEZ LOTE NO. 2 AMPLIACION S UBESTACION ELECTRICA BELLAVIST A EN 138-13.8 KV, 50 MVA. CONS TRUCCION SUBESTACION ELECTRICA EL CENTRO 138-13.8 IW., 50 MV A. Y CONSTRUCCION DE LINEA DE TRANSMISION TERNA SENCILLA EN 138KV ENTRE LAS SUBESTACIONES ELECTRICAS BELLAVISTA Y EL CEN TRO CARGADORES Y BANCOS DE BATERIA S, EQUIPO AUXILIAR PL: BECE-0 16, LAMI-015 PROJECT LOTE NO .1 AMPLIACION SUBESTACION ELEC TRICA MIRAFLORES 138-13.8 KV, 50 MVA. AMPLIACION SUBESTACION ELECTRICA LAINEZ 138-13.8 KV, 50 MVA. Y CONSTRUCCION DE LIN EA DE TRANSMISION TERNA SENCIL LA EN 138 KV ENTRE LAS SUBESTA CIONES ELECTRICAS MIRAFLORES-L AINEZ LOTE NO. 2 AMPLIACION S UBESTACION ELECTRICA BELLAVIST A EN 138-13.8 KV, 50 MVA. CONS TRUCCION SUBESTACION ELECTRICA EL CENTRO 138-13.8 IW., 50 MV A. Y CONSTRUCCION DE LINEA DE TRANSMISION TERNA SENCILLA EN 138KV ENTRE LAS SUBESTACIONES ELECTRICAS BELLAVISTA Y EL CEN TRO |
2023-05-14 | GFLOTGU230301724 | ELECNOR SERVICIOS Y PROYECTOS S A | 1424.0 kg | 842119 | CYLINDERS, INSTALLATION KIT,BRASS COMPRESSION FITTING, SPIN-ON FILTER CARTRIDGES |