Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.08 | Average TEU per month: 0.08 |
Active Months: 1 | Average TEU per Shipment: 1.00 |
Shipment Frequency Std. Dev.: 0.29 |
Company Name | Shipments |
---|---|
HANGZHOU HANDUN MACHINERY CO LTD | 3 shipments |
EXOTEC | 1 shipments |
HANGZHOU HANDUN MACHINERYCO LTD | 1 shipments |
SARL FRANCK FORTIER | 1 shipments |
HS Code | Shipments |
---|---|
731512 Chain and parts thereof, of iron or steel : Chain; articulated link, (other than roller), of iron or steel | 4 shipments |
854470 Insulated wire, cable and other electric conductors, connector fitted or not; optical fibre cables of individually sheathed fibres, whether or not assembled with electric conductors or fitted with connectors : Insulated electric conductors; optical fibre cables | 1 shipments |
900921 | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-01-22 | TSVC17800011823 | EXOTEC | 2435.0 kg | 900921 | SKYPROD SYSTEM - HAZ UN3480 |
2022-10-06 | TSVCCN100852030 | HANGZHOU HANDUN MACHINERY CO LTD | 6912.0 kg | 731512 | ROLLER CHAIN |
2022-05-07 | CROIATL255671 | SARL FRANCK FORTIER | 920.0 kg | 854470 | CABLES |
2022-05-04 | EURFL22305276NYC | HANGZHOU HANDUN MACHINERYCO LTD | 4540.0 kg | 731512 | ROLLER CHAIN |
2021-10-08 | EURFL21805876HOU | HANGZHOU HANDUN MACHINERY CO LTD | 8070.0 kg | 731512 | ROLLER CHAIN |
2021-09-30 | EURFL21715738HOU | HANGZHOU HANDUN MACHINERY CO LTD | 8160.0 kg | 731512 | ROLLER CHAIN |