Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|
HS Code | Shipments |
---|---|
900921 | 11 shipments |
720421 Ferrous waste and scrap; remelting scrap ingots of iron or steel : Ferrous waste and scrap; of stainless steel | 3 shipments |
311878 | 1 shipments |
730290 Railway or tramway track constructions of iron or steel; rails, check and track rails, switch blades, crossing frogs, point rods, sleepers, fish-plates, chair wedges, sole plates, bedplates, ties and the like : Iron or steel, railway or tramway track construction material; n.e.c. in heading no. 7302 | 1 shipments |
842541 Pulley tackle and hoists other than skip hoists; winches and capstans; jacks : Jacks; built-in jacking systems of a type used in garages, for raising vehicles | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2021-11-13 | EGLV573100008639 | 56468.0 kg | 730290 | STEEL STEEL SUPPLY OF MATERIAL FOR RACKING SYSTEMS THE SAME THE SAME STEEL | |
2021-11-13 | EGLV573100008647 | 56362.0 kg | 720421 | STEEL SUPPLY OF MATERIAL FOR RACKING SYSTEMS THE SAME THE SAME STEEL STEEL | |
2021-11-06 | EGLV573100004374 | 65740.0 kg | 842541 | SUPPLY OF MATERIAL FOR RACKING SYSTEMS SUPPLY OF MATERIAL FOR RACKING SYSTEMS SUPPLY OF MATERIAL FOR RACKING SYSTEMS SUPPLY OF MATERIAL FOR RACKING SYSTEMS SUPPLY OF MATERIAL FOR RACKING SYSTEMS THE SAME THE SAME THE SAME | |
2021-11-06 | EGLV573100008248 | 29938.0 kg | 720421 | STEEL STEEL SUPPLY OF MATERIAL FOR RACKING SYSTEMS THE SAME | |
2021-08-20 | EGLV573100003211 | 94198.0 kg | 311878 | SUPPLY OF MATERIALS FOR RACKING SYSTEM SUPPLY OF MATERIALS FOR RACKING SYSTEM SUPPLY OF MATERIALS FOR RACKING SYSTEM SUPPLY OF MATERIALS FOR RACKING SYSTEM SUPPLY OF MATERIALS FOR RACKING SYSTEM 1 X 40HC // 31 BUNDLES // 18786.000KGS // 50.000 CBM SUPPLY OF MATERIALS FOR RACKING SYSTEM 1 X 40HC // 31 BUNDLES // 18786.000KGS // 50.000 CBM SUPPLY OF MATERIALS FOR RACKING SYSTEM 1 X 40HC // 31 BUNDLES // 18786.000KGS // 50.000 CBM SUPPLY OF MATERIALS FOR RACKING SYSTEM 1 X 40HC // 43 BUNDLES // 18920.000KGS // 50.000 CBM SUPPLY OF MATERIALS FOR RACKING SYSTEM 1 X 40HC // 43 BUNDLES // 18920.000KGS // 50.000 CBM SUPPLY OF MATERIALS FOR RACKING SYSTEM | |
2021-08-20 | EGLV573100004358 | 91657.0 kg | 720421 | STEEL STEEL STEEL 31 BUNDLES SUPPLY OF MATERIALS FOR RACKING SYSTEM 40 BUNDLES SUPPLY OF MATERIALS FOR RACKING SYSTEM 25 BUNDLES SUPPLY OF MATERIALS FOR RACKING SYSTEM 18 BUNDLES SUPPLY OF MATERIALS FOR RACKING SYSTEM 25 BUNDLES SUPPLY OF MATERIALS FOR RACKING SYSTEM STEEL STEEL | |
2021-05-26 | SUDU71342AF9T004 | 37324.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACK8ING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-05-25 | SUDU71342AFTK011 | 37840.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERAILSFOR RACKING SYSTEM | |
2021-05-13 | SUDU71342AFMY011 | 37572.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIAL FOR RACKING SYSTEM | |
2021-05-13 | SUDU71342AFMY017 | 37452.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIAL FOR RACKING SYSTEM | |
2021-05-13 | SUDU71342AFQ9009 | 37698.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-05-13 | SUDU71342AFQ9012 | 37452.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-04-30 | SUDU71342AFJD011 | 37452.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-04-30 | SUDU71342AFJD001 | 37700.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-04-21 | SUDU71342AFCT005 | 46081.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-04-21 | SUDU71342AFFY015 | 52128.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM | |
2021-04-09 | SUDU71342AF9A005 | 67343.0 kg | 900921 | SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM SUPPLY OF MATERIALSFOR RACKING SYSTEM |