Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.25 | Average TEU per month: 1.16 |
Active Months: 1 | Average TEU per Shipment: 4.62 |
Shipment Frequency Std. Dev.: 0.87 |
Company Name | Shipments |
---|---|
HOST BIOGAS BV | 2 shipments |
BRIGHT RENEWABLES B V | 1 shipments |
HS Code | Shipments |
---|---|
841861 Refrigerators, freezers and other refrigerating or freezing equipment, electric or other; heat pumps other than air conditioning machines of heading no. 8415 : Heat pumps; other than air conditioning machines of heading no. 8415 | 1 shipments |
852610 Radar apparatus, radio navigational aid apparatus and radio remote control apparatus : Radar apparatus | 1 shipments |
902290 X-ray, alpha, beta, gamma radiation apparatus; x-ray tubes, x-ray generators, high tension generators, control panels and desks, screens, examination or treatment tables, chairs and the like : Apparatus based on use of x-rays and similar; parts and accessories (x-ray generators, tubes, high tension generators, control panels and desks, screens, examination or treatment tables, chairs and like | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-01-14 | MAEU233766089 | HOST BIOGAS BV | 66800.76 kg | 902290 | 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION 6 X 40 FT HIGH CUBE SO CONTAIN ERS AS PARTS OF BIOGAS INSTALL ATION |
2024-01-14 | MAEU233990270 | BRIGHT RENEWABLES B V | 17180.1 kg | 852610 | 2X 45 FT HCPW SO CONTAINER AS BIOGAS UPGRADING INSTALLATION 2X 45 FT HCPW SO CONTAINER AS BIOGAS UPGRADING INSTALLATION |
2024-01-08 | MAEU233766350 | HOST BIOGAS BV | 9990.09 kg | 841861 | 1 X 45 FT HIGH CUBE PW SO CONT AINER WITH HEAT EXCHANGER AS P ART OF BIOMASS INSTALLATION |