Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
SCHENCK PROCESS AFRICA PTY LTD | 2 shipments |
HS Code | Shipments |
---|---|
293339 Heterocyclic compounds with nitrogen hetero-atom(s) only : Heterocyclic compounds; containing an unfused pyridine ring (whether or not hydrogenated) in the structure, n.e.c. in 2933.3 | 1 shipments |
842539 Pulley tackle and hoists other than skip hoists; winches and capstans; jacks : Winches; capstans; not powered by an electric motor | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-01-15 | BANQ1049399315 | SCHENCK PROCESS AFRICA PTY LTD | 105773.0 kg | 293339 | SCREEN ASSEMBLY STEEL BEAM 70-8 HAND RAIL 70-9 . . SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 70-1,2,3,4,6 STRUCTURE STEEL SPLICE PLATES 70-7 EXCITER GEARBOXES 100 SCREEN ASSEMBLY STEEL BEAM 69-8 HAND RAIL 69-9 . . SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 81-1,2,3,4,7 EXCITER GEARBOXES PALLETS BOLTS 11-5 & 11-6 SCREEN ASSEMBLY STEEL BEAM 68-8 HAND RAIL 68-9 . . SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 68-1,2,3,4,5,6 STRUCTURE STEEL SPLICE PLATES 68-7 EXCITER GEARBOXES 105 SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 82-1,2,3,4 STRUCTURE STEEL SPLICE PLATES 82-7 SCREEN ASSEMBLY STEEL BEAM 82-5 HAND RAIL 82-6 CRATE 112 . SCREEN ASSEMBLY STEEL BEAM 81-5 HAND RAIL 81-6 . . SCREEN ASSEMBLY STEEL BEAM 80-5 HAND RAIL 80-6 . . SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 80-1,2,3,4 CRATE PLATES 80-7 . SCREEN ASSEMBLY STRUCTURE STEEL BUNDLE 69-1,2,3,4,5,6,7 . . |
2022-10-27 | BANQ1046870408 | SCHENCK PROCESS AFRICA PTY LTD | 7087.0 kg | 842539 | 5 X CONIQ MONITORING SYSTEM ELECTRIC MOTORS 3 X 125HP IEEE 841 MOTORS 2 X 75HP IEEE 841 MOTORS 5 X 50HP IEEE 841 MOTORS INVOICE NO: 7600-615-2 |