Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.29 | Average TEU per month: 0.58 |
Active Months: 2 | Average TEU per Shipment: 1.75 |
Shipment Frequency Std. Dev.: 0.73 |
Company Name | Shipments |
---|---|
IRONFLO MACHINERY MANUFACTURE | 2 shipments |
SHANGHAI HUNTING MACHINERY CO | 2 shipments |
IRONFLO MACHINERY MANUFACTURE JIAN | 1 shipments |
IRONFLO MACHINERY MANUFACTURE JIANG | 1 shipments |
MELTING SEALING I P LTD | 1 shipments |
HS Code | Shipments |
---|---|
681091 Cement, concrete or artificial stone; whether or not reinforced, articles thereof : Cement, concrete or artificial stone; prefabricated structural components for building or civil engineering, whether or not reinforced | 6 shipments |
293219 Heterocyclic compounds with oxygen hetero-atom(s) only : Heterocyclic compounds; with oxygen hetero-atom(s) only, containing an unfused furan ring (whether or not hydrogenated) in the structure, n.e.c. in item no. 2932.1 | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-06-09 | SEMDCYSH24050274 | SHANGHAI HUNTING MACHINERY CO | 19890.0 kg | 681091 | WELLHEAD COMPONENTS |
2024-06-02 | TLKPSHAVCR45047X | IRONFLO MACHINERY MANUFACTURE JIAN | 18358.0 kg | 681091 | WELLHEAD COMPONENTS |
2024-03-18 | SEMDCYSH24020175 | IRONFLO MACHINERY MANUFACTURE | 19923.0 kg | 681091 | WELLHEAD COMPONENTS |
2024-03-09 | SEMDCYSH24020129 | SHANGHAI HUNTING MACHINERY CO | 19765.0 kg | 681091 | WELLHEAD COMPONENTS |
2023-05-13 | SEMDCYSH23040191 | IRONFLO MACHINERY MANUFACTURE | 18089.0 kg | 681091 | WELLHEAD COMPONENTS |
2023-04-15 | EMUICH22S0006260 | MELTING SEALING I P LTD | 19822.0 kg | 293219 | RING GASKETS |
2023-02-21 | TLKPSHAVCR31029X | IRONFLO MACHINERY MANUFACTURE JIANG | 58368.0 kg | 681091 | WELLHEAD COMPONENTS WELLHEAD COMPONENTS WELLHEAD COMPONENTS |