Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.25 | Average TEU per month: 0.46 |
Active Months: 4 | Average TEU per Shipment: 1.38 |
Shipment Frequency Std. Dev.: 0.45 |
Company Name | Shipments |
---|---|
GALVAN SRL | 4 shipments |
QINGDAO DONG BO CHAIN CO LTD | 4 shipments |
MAGRIS SRL | 2 shipments |
SUZHOU FUBANG MACHINERY CHAIN | 2 shipments |
DONG BO CHAIN VINA CO LTD | 1 shipments |
HANGZHOU SHINELINK MACHINERY CO | 1 shipments |
HANGZHOU SHINELINK MACHINERY CO LTD | 1 shipments |
STABTEC SRL | 1 shipments |
HS Code | Shipments |
---|---|
121130 Plants and parts of plants (including seeds and fruits), of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered : Coca leaf; of a kind used primarily in perfumery, in pharmacy or for insecticidal, fungicidal or similar purposes, fresh, chilled, frozen or dried, whether or not cut, crushed or powdered | 4 shipments |
401610 Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40 : Rubber; vulcanised (other than hard rubber), moulded rubber mats and mats of non-rectangular shape made by cutting from the piece, of cellular rubber | 4 shipments |
591000 Textiles; transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material : Textiles; transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material | 2 shipments |
731512 Chain and parts thereof, of iron or steel : Chain; articulated link, (other than roller), of iron or steel | 2 shipments |
741910 Copper; articles thereof n.e.c. in chapter 74 : Copper; chain and parts thereof | 2 shipments |
722230 Stainless steel bars and rods, angles, shapes and sections : Steel, stainless; bars and rods, n.e.c. in heading no. 7222 | 1 shipments |
731590 Chain and parts thereof, of iron or steel : Chain; parts n.e.c. in heading no. 7315, of iron or steel | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-05-31 | ECUWMILIND01067 | MAGRIS SRL | 1545.0 kg | 591000 | COMPONENTS FOR CONVEYOR BELTS |
2023-12-16 | SSLL202315496001 | GALVAN SRL | 6755.0 kg | 401610 | HARD RUBBER |
2023-11-28 | SWOEHC1S02506036 | DONG BO CHAIN VINA CO LTD | 1046.0 kg | 741910 | LEAF CHAIN . |
2023-10-09 | SHPT16230106 | HANGZHOU SHINELINK MACHINERY CO LTD | 40.0 kg | 741910 | CHAIN PART |
2023-09-30 | SHPT16226545 | SUZHOU FUBANG MACHINERY CHAIN | 20.0 kg | 731512 | ROLLER CHAIN AND CHAIN PARTS |
2023-08-12 | SSLL202313439601 | GALVAN SRL | 3316.0 kg | 401610 | RUBBER PADDLES |
2023-08-09 | SWOESH1S02426495 | HANGZHOU SHINELINK MACHINERY CO | 635.0 kg | 731590 | ARTICULATED CHAIN CHAIN PART |
2023-06-21 | SHPT16199133 | SUZHOU FUBANG MACHINERY CHAIN | 1461.0 kg | 731512 | ROLLER CHAIN AND CHAIN PARTS |
2023-04-23 | SSLL202311390501 | GALVAN SRL | 3316.0 kg | 401610 | RUBBER PADDLES |
2022-12-06 | SHPT29884792 | QINGDAO DONG BO CHAIN CO LTD | 5250.0 kg | 121130 | LEAF CAHIN |
2022-10-18 | SHPT29882931 | QINGDAO DONG BO CHAIN CO LTD | 11000.0 kg | 121130 | LEAF CAHIN |
2022-09-28 | SHPT29882486 | QINGDAO DONG BO CHAIN CO LTD | 3530.0 kg | 121130 | LEAF CAHIN AND PARTS |
2022-07-15 | CBLACL22106585 | MAGRIS SRL | 3000.0 kg | 591000 | COMPONENTS FOR CONVEYOR BELTS |
2022-07-03 | SHPT29878044 | QINGDAO DONG BO CHAIN CO LTD | 8140.0 kg | 121130 | LEAF CAHIN |
2022-03-19 | SSLL202210640901 | GALVAN SRL | 3316.0 kg | 401610 | RUBBER PADDLES |
2022-03-05 | SSLL202117021301 | STABTEC SRL | 1350.0 kg | 722230 | STEEL BARS |