Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.14 | Average TEU per month: 0.25 |
Active Months: 2 | Average TEU per Shipment: 1.52 |
Shipment Frequency Std. Dev.: 0.36 |
Company Name | Shipments |
---|---|
GUANGDONG CHUANQI NEW MATERIAL CO | 7 shipments |
GUANGDONG CHUANQI COMPOUND STONE CO LTD | 4 shipments |
GUANGDONG CHUANQI COMPOUND STONE CO | 2 shipments |
GUANGDONG MINGSHANG NEW MATERIAL CO | 1 shipments |
HS Code | Shipments |
---|---|
251622 Granite, porphyry, basalt, sandstone, other monumental and building stone, whether or not roughly trimmed, cut, by sawing etc, into blocks or slabs of a rectangular (including square) shape | 9 shipments |
681099 Cement, concrete or artificial stone; whether or not reinforced, articles thereof : Cement, concrete or artificial stone; articles (other than prefabricated structural components for building or civil engineering), whether or not reinforced, n.e.c. in heading no. 6810 | 3 shipments |
180632 Chocolate and other food preparations containing cocoa : Chocolate and other food preparations containing cocoa; in blocks, slabs or bars, (not filled), weighing 2kg or less | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-10-01 | FEVMSZXF24090104 | GUANGDONG CHUANQI NEW MATERIAL CO | 26990.0 kg | 251622 | 8 PACKAGES OF ENGINEERED STONE SLABS |
2024-07-11 | FEVMSZXF24061528 | GUANGDONG CHUANQI NEW MATERIAL CO | 26990.0 kg | 251622 | 8 PACKAGES OF ENGINEERED STONE SLABS |
2023-11-15 | FEVMSZXF23100288 | GUANGDONG CHUANQI NEW MATERIAL CO | 53780.0 kg | 180632 | 2 X 20 DRY VAN 16 PACKAGES OF ENGINEERED STO NE SLABS 2 X 20 DRY VAN 16 PACKAGES OF ENGINEERED STO NE SLABS |
2023-07-09 | NCZLSZ23060513 | GUANGDONG CHUANQI NEW MATERIAL CO | 53760.0 kg | 251622 | ENGINEERED STONE SLABS ENGINEERED STONE SLABS |
2023-04-25 | NCZLSZ23030431 | GUANGDONG CHUANQI NEW MATERIAL CO | 51720.0 kg | ENGINEERED ENGINEERED | |
2022-11-20 | FEVMSZXF22100941 | GUANGDONG CHUANQI NEW MATERIAL CO | 26380.0 kg | 251622 | 8 PACKAGES OF ENGINEERED STONE SLABS |
2022-10-27 | FEVMSZXF22090221 | GUANGDONG CHUANQI NEW MATERIAL CO | 26800.0 kg | 251622 | 8 PACKAGES OF ENGINEERED STONE SLABS |
2022-10-05 | FEVMSZXF22080668 | GUANGDONG MINGSHANG NEW MATERIAL CO | 26450.0 kg | 251622 | 8 PACKAGES OF ENGINEERED STONE SLABS |
2022-06-25 | NCZLSZ22050610 | GUANGDONG CHUANQI COMPOUND STONE CO LTD | 26340.0 kg | 251622 | ENGINEERED STONE SLABS |
2022-04-18 | SZIDYHHCN2203032 | GUANGDONG CHUANQI COMPOUND STONE CO | 21490.0 kg | 681099 | ENGINEERED STONE SLABS H.S 68109990 THIS SHI PMENT CONTAINS WOOD PACKAGING MATERIALS AND HAS BEEN FUMIGATED. |
2022-02-18 | SZIDARKCN2112077 | GUANGDONG CHUANQI COMPOUND STONE CO | 21490.0 kg | 681099 | ENGINEERED STONE SLABS H.S 68109990 THIS SHI PMENT CONTAINS WOOD PACKAGING MATERIALS AND HAS BEEN FUMIGATED. |
2021-08-27 | SZIDARKCN2107105 | GUANGDONG CHUANQI COMPOUND STONE CO LTD | 52320.0 kg | 681099 | ENGINEERED STONE SLABS H.S:68109990 THIS SHIPMENT CONTAINS WOOD PACKAGING MATERIALS AND HAS BEEN FUMIGATED. ENGINEERED STONE SLABS H.S:68109990 THIS SHIPMENT CONTAINS WOOD PACKAGING MATERIALS AND HAS BEEN FUMIGATED. |
2021-05-03 | NCZLSZ21030642 | GUANGDONG CHUANQI COMPOUND STONE CO LTD | 53580.0 kg | 251622 | ENGINEERED STONE SLABS ENGINEERED STONE SLABS |
2021-03-07 | BKGAF2101955 | GUANGDONG CHUANQI COMPOUND STONE CO LTD | 25060.0 kg | 251622 | ENGINEERED STONE SLABS |