Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
AKEBONO CO LTD | 1 shipments |
HS Code | Shipments |
---|---|
842951 Bulldozers, graders, levellers, scrapers, angledozers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers, self-propelled : Front-end shovel loaders | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-06-12 | MEDUJA321390 | AKEBONO CO LTD | 2520.0 kg | 842951 | TWO USED CARS MAZDA RX-7, CHASSIS: FD3S-304075 FUEL: G ENGINE: 0.65X2L LWH: 428X176X123 C M WEIGHT: 1260 KG, M3 : 9.265 M3 MAZDA RX-7, CHASSIS: FD3S-406362 FUEL: G ENGINE: 0.65X2L LWH: 428X176X123 CM WEIGHT: 1260 KG, M3 : 9. 265 M3 |