Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.18 | Average TEU per month: 0.67 |
Active Months: 3 | Average TEU per Shipment: 2.67 |
Shipment Frequency Std. Dev.: 0.39 |
Company Name | Shipments |
---|---|
CHANGSHA XIANGJIA METAL MATERIAL TR | 3 shipments |
CHANGSHA XIANGJIA METAL MATERIAL TRADE CO LTD | 1 shipments |
HS Code | Shipments |
---|---|
730840 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures : Iron or steel; structures and parts thereof, props and similar equipment for scaffolding, shuttering or pit-propping | 4 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-05-17 | TLKPTJNNYC43015X | CHANGSHA XIANGJIA METAL MATERIAL TR | 39700.0 kg | 730840 | SCAFFOLDING CROSS BRACE SCAFFOLDING JOINT PI N SCAFFOLDING FRAME SCAFFOLDING PUNCH HOLD GUARDRAILS SCAFFOLDING DOOR FRAME FENCE POST SCAFFOLDING CROSS BRACE SCAFFOLDING JOINT PI N SCAFFOLDING FRAME SCAFFOLDING PUNCH HOLD GUARDRAILS SCAFFOLDING DOOR FRAME FENCE POST |
2023-11-28 | TLKPTJNNYC3A020X | CHANGSHA XIANGJIA METAL MATERIAL TR | 19850.0 kg | 730840 | SCAFFOLDING CROSS BRACE SCAFFOLDING JOINT PI N SCAFFOLDING FRAME SCAFFOLDING CATWALK SC AFFOLDING GIN WHEELE SCAFFOLDING HOIST AND A RM |
2023-10-22 | OERT204701M00803 | CHANGSHA XIANGJIA METAL MATERIAL TRADE CO LTD | 19748.0 kg | 730840 | SCAFFOLDING ACESS LADDER SCAFFOLDING COUPLER SCAFFOLDING FRAME SCAFFOLDING COUPLING PINS SCAFFOLDING JACK BASE SCAFFOLDING LADDER COUPLER SCAFFOLDING SPPED LOCK PIN SCAFFOLDING STEEL PROP RENMIN EAST ROAD, CHANGSHA,HUNAN,CH INA CY/CY |
2023-05-24 | PRIM2DP04015 | CHANGSHA XIANGJIA METAL MATERIAL TR | 19760.0 kg | 730840 | SCAFFOLDING FRAME SCAFFOLDING JOINT PIN SCAFFRDRAILS SCAFFOLDING GUARDRAIL POST SCAFFOLDING TOGGLE PIN SCAFFOLDING SIDE BRACKET |