Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.16 | Average TEU per month: 0.38 |
Active Months: 3 | Average TEU per Shipment: 1.50 |
Shipment Frequency Std. Dev.: 0.37 |
Company Name | Shipments |
---|---|
AVANTOR VWR SHANGHAI CO LTD | 4 shipments |
SHANGHAI WIND AUTOMATION EQUIPMENT | 2 shipments |
ZINCALU CASTING SDN BHD | 1 shipments |
HS Code | Shipments |
---|---|
660191 Umbrellas; sun umbrellas (including walking stick umbrellas, garden umbrellas and similar umbrellas) : Umbrellas and sun umbrellas; having a telescopic shaft, (excluding garden or similar umbrellas) | 2 shipments |
840690 Turbines; steam and other vapour turbines : Turbines; parts of steam and other vapour turbines | 1 shipments |
842951 Bulldozers, graders, levellers, scrapers, angledozers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers, self-propelled : Front-end shovel loaders | 1 shipments |
848390 Transmission shafts (including cam and crank) and cranks; bearing housings and plain shaft bearings; gears and gearing; ball or roller screws; gear boxes and other speed changers; flywheels and pulleys; clutches and shaft couplings : Transmission components; toothed wheels, chain sprockets and other transmission elements presented separately; parts | 1 shipments |
850231 Electric generating sets and rotary converters : Electric generating sets; wind-powered, (excluding those with spark-ignition or compression-ignition internal combustion piston engines) | 1 shipments |
851521 Electric (electrically heated gas) soldering, brazing, welding machines and apparatus, capable or not of cutting, electric machines and apparatus for hot spraying of metals or sintered carbides : Welding machines and apparatus; for resistance welding of metal, fully or partly automatic, whether or not capable of cutting | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-09-06 | CHSL484222250PVG | SHANGHAI WIND AUTOMATION EQUIPMENT | 1920.0 kg | 850231 | WIND-ATS DOUBLE STATION ARMATURE TESTING MACHINE TOOLINGS FOR COMMUTATORS WIND-DC-CW003 COMMUTATOR FUSING MACHINE WIND-CT-TH4 COMMUTATOR TURNING MACHINE |
2024-06-08 | CHSL473377335PVG | SHANGHAI WIND AUTOMATION EQUIPMENT | 1000.0 kg | 851521 | WIND-ST-TD2B FULLY AUTOMATIC ARMATURE WINDINGMACHINE AND TOOLINGS |
2023-12-13 | CHSL453258358KUL | ZINCALU CASTING SDN BHD | 352.0 kg | 848390 | 1 PALLET CONTAINING 39 BOXES OF GEAR HOUSING PO 24670-1, 24670-2, 24670-3 HS CODE 8483.90.9900 EX-WORK TERM |
2023-05-20 | CHSL433011844PVG | AVANTOR VWR SHANGHAI CO LTD | 988.0 kg | 660191 | REV A REAR ENDBELL MACHINED REV A SHAFT,3 8 CJ AVIATION, 90-38 |
2023-05-12 | CHSL432554587PVG | AVANTOR VWR SHANGHAI CO LTD | 4844.0 kg | 840690 | CABLE SHIELDED ENDBELL BEAR MACHINED ENDBELL MACH D FRONT STATOR ASSEMBLY SHAFT |
2023-04-14 | CHSL429831769PVG | AVANTOR VWR SHANGHAI CO LTD | 1658.0 kg | 842951 | REV A END BELL REAR REV A END BELL FRONT REV B STATOR ASSEMBLY |
2023-02-28 | CHSL423620782PVG | AVANTOR VWR SHANGHAI CO LTD | 980.0 kg | 660191 | REV A REAR ENDBELL MACHINED REV A SHAFT,3 8 CJ AVIATION, 90-38 |