Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
SHANGHAI TODENKO ELECTRIC CO LTD | 5 shipments |
HS Code | Shipments |
---|---|
730230 Railway or tramway track constructions of iron or steel; rails, check and track rails, switch blades, crossing frogs, point rods, sleepers, fish-plates, chair wedges, sole plates, bedplates, ties and the like : Iron or steel, railway or tramway track construction material; switch blades, crossing frogs, point rods and other crossing pieces | 5 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2021-02-28 | YASVSHA0650363 | SHANGHAI TODENKO ELECTRIC CO LTD | 208.0 kg | 730230 | SWITCH |
2021-02-18 | YASVSHA0647105 | SHANGHAI TODENKO ELECTRIC CO LTD | 39.0 kg | 730230 | SWITCH |
2021-02-09 | YASVSHA0646138 | SHANGHAI TODENKO ELECTRIC CO LTD | 208.0 kg | 730230 | SWITCH |
2021-01-15 | YASVSHA0641016 | SHANGHAI TODENKO ELECTRIC CO LTD | 338.0 kg | 730230 | SWITCH |
2020-12-30 | YASVSHA0637206 | SHANGHAI TODENKO ELECTRIC CO LTD | 247.0 kg | 730230 | SWITCH |