Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.22 | Average TEU per month: 0.67 |
Active Months: 4 | Average TEU per Shipment: 2.00 |
Shipment Frequency Std. Dev.: 0.43 |
Company Name | Shipments |
---|---|
GLOBAL STEEL SOLUTIONS GROUP | 8 shipments |
NSI INDIA LIMITED | 1 shipments |
PARAS ENGINEERING WORKS | 1 shipments |
PARAS ENGINEERING WORKS COAL DUMP TMN | 1 shipments |
HS Code | Shipments |
---|---|
730890 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures : Iron or steel; structures and parts thereof, n.e.c. in heading 7308 | 2 shipments |
731600 Anchors, grapnels and parts thereof, of iron or steel : Iron or steel; anchors, grapnels and parts thereof | 2 shipments |
760320 Aluminium; powders and flakes : Aluminium; powders of lamellar structure, flakes | 2 shipments |
890800 Vessels and other floating structures; for breaking up : Vessels and other floating structures; for breaking up | 2 shipments |
721622 Iron or non-alloy steel, angles, shapes and sections : Iron or non-alloy steel; T sections, hot-rolled, hot-drawn or extruded, of a height less than 80mm | 1 shipments |
830241 Base metal mountings, fittings and similar articles for furniture, doors, staircases, windows, trunks, chests etc, castors with mountings of base metal, automatic door closers of base metal : Mountings, fittings and similar articles; of base metal, suitable for buildings | 1 shipments |
854099 Thermionic, cold cathode or photo-cathode valves and tubes (e.g. vacuum, vapour, gas filled valves and tubes, mercury arc rectifying valves and tubes, cathode-ray and television camera tubes) : Valves and tubes; parts of the valves and tubes of heading no. 8540, excluding parts of cathode-ray tubes | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-09-09 | SWLVILAKOL000028 | GLOBAL STEEL SOLUTIONS GROUP | 20836.0 kg | 890800 | OTHER STRUCTURE AND PARTS OF STRUCTURES OF IRON AND STEEL(EXCL FLOATING STRUCTURES |
2024-06-24 | SWLVILAKOL000024 | GLOBAL STEEL SOLUTIONS GROUP | 20750.0 kg | 730890 | OTHER STRUCTURE AND PARTS OF STRUCTURES OF IRON AND STEEL |
2024-02-27 | SWLVILAKOL000015 | GLOBAL STEEL SOLUTIONS GROUP | 20595.0 kg | 731600 | PARTS OF IRON AND STEEL |
2023-12-28 | SWLVILAKOL000010 | GLOBAL STEEL SOLUTIONS GROUP | 20783.0 kg | 731600 | PARTS OF IRON AND STEEL |
2023-11-22 | SWLVILAKOL000008 | GLOBAL STEEL SOLUTIONS GROUP | 20790.0 kg | 730890 | OTHER STRUCTURE AND PARTS OF STRUCTURES OF IRON AND STEEL |
2023-08-26 | SWLVILAKOL000002 | GLOBAL STEEL SOLUTIONS GROUP | 20695.0 kg | 890800 | OTHER STRUCTURE AND PARTS OF STRUCTURES OF IRON AND STEEL (EXCL FLOATING STRUCTURES) |
2023-06-10 | SWLVSWLKOL000859 | GLOBAL STEEL SOLUTIONS GROUP | 20945.0 kg | 760320 | OTHER STRUCTURE AND PARTS OF STRUCTURE OF IRON AND STEEL (EXCL. FLOATING STRUCTURE) |
2023-05-10 | SWLVSWLKOL000812 | NSI INDIA LIMITED | 20367.0 kg | 760320 | OTHER STRUCTURE AND PARTS OF STRUCTURE OF IRO. |
2023-04-12 | SWLVSWLKOL000755 | GLOBAL STEEL SOLUTIONS GROUP | 20991.0 kg | 854099 | OTHER STRUCKTURE AND PARTS OF STRUCTURES OR I. |
2021-03-22 | LCQILIMKOL202616 | PARAS ENGINEERING WORKS | 18390.0 kg | 721622 | GALVANIZED FABRICATED STEEL HARDWARE STRUCTUREINVOICE NO. PEW0462021DT. 09.01.2021BUYERS ORDER NO.PO NO8 DT:17.12.2020PACKING: TOTAL 20CRATESSB NO. 7794458 DT: 09.01.2021NET WIEGH T: 17160.00 KGS |
2021-01-13 | LCQILIMKOL202605 | PARAS ENGINEERING WORKS COAL DUMP TMN | 18025.0 kg | 830241 | GALVANIZED FABRICATED STEEL HARDWARE STRUCTURE |
30427 COMMERCE DRIVE SAN ANTONIO FL 33576 US |
---|