Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
METALPLAK TRANSFORMACIONES METALICA | 8 shipments |
METALPLAK TRANS METALICAS | 3 shipments |
METALPLAK TRANSFORMACIONES | 1 shipments |
HS Code | Shipments |
---|---|
730900 Reservoirs, tanks, vats and similar containers; for any material (excluding compressed or liquefied gas), of iron or steel, capacity exceeding 300l, whether or not lined or heat insulated : Reservoirs, tanks, vats and similar containers; for any material (excluding compressed or liquefied gas), of iron or steel, capacity exceeding 300l, whether or not lined or heat insulated | 10 shipments |
851822 Microphones and their stands; loudspeakers, mounted or not in their enclosures; headphones and earphones, combined or not with a microphone, and sets of a microphone and one or more loudspeakers; audio frequency and electric sound amplifiers and sets : Loudspeakers; multiple, mounted in the same enclosure | 2 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-03-29 | CMDUIBC1043184 | METALPLAK TRANSFORMACIONES METALICA | 18026.0 kg | 851822 | . FREIGHT PREPAID 730900 (CG) POWRBANK XPRO SKID FRAME AND ENCLOSURE, |
2022-11-28 | CMDUIBC0999457 | METALPLAK TRANS METALICAS | 10673.0 kg | 730900 | FREIGHT PREPAID METAL BODYWORK POWRBANK PRO MKII EU MO CONFIG 2 HS CODE : 730900 |
2022-10-24 | CMDUIBC0985354 | METALPLAK TRANS METALICAS | 13176.0 kg | 730900 | FREIGHT PREPAID METAL BODYWORK CHA POWRBANK PRO MKII US MO CONFIG 1 HS CODE 730900 |
2022-07-25 | CMDUIBC0934084 | METALPLAK TRANSFORMACIONES | 12426.0 kg | 851822 | FREIGHT PREPAID 9 PACKAGE ENCLOSURE FITTINGS 730900 |
2022-06-24 | CMDUIBC0928033 | METALPLAK TRANS METALICAS | 12446.0 kg | 730900 | FREIGHT PREPAID CHA POWRBANK PRO MKII US MO CONFIG 1 HS CODE 730900 |
2022-05-26 | MEDUCI689596 | METALPLAK TRANSFORMACIONES METALICA | 8640.0 kg | 730900 | CHA POWRBANK PRO MKII US MO CONFIG 1 HS CODE 730900 |
2022-05-26 | MEDUCI664680 | METALPLAK TRANSFORMACIONES METALICA | 9622.0 kg | 730900 | CHA POWRBANK PRO MKII US MO CONFIG 1 HS CODE 730900 |
2022-03-18 | MEDUCI591453 | METALPLAK TRANSFORMACIONES METALICA | 8640.0 kg | 730900 | CHA POWRBANK PRO MKII US MO CONFIG 1 HS HS CODE 730900 16 PACKAGES |
2022-02-19 | MEDUCI565804 | METALPLAK TRANSFORMACIONES METALICA | 8908.0 kg | 730900 | CHA POWRBANK PRO MKII US M O CONFIG 1 HS HS CODE 730900 16 PACKAGE |
2022-01-14 | MEDUV7086741 | METALPLAK TRANSFORMACIONES METALICA | 8640.0 kg | 730900 | CHA POWRBANK PRO MKII US M O CONFIG 1 HS CODE:730900 |
2021-12-09 | MEDUV4937938 | METALPLAK TRANSFORMACIONES METALICA | 8640.0 kg | 730900 | CHA POWRBANK PRO MKII US M O CONFIG 1 HS CODE:730900 |
2021-11-03 | MEDUV4864520 | METALPLAK TRANSFORMACIONES METALICA | 8586.0 kg | 730900 | 7 COLLI POWRBANK XPRO SKID FRAME AND ENCLOSURE, INCLUDING ALL ENCLOSURE FITTINGS. US VERSION 2 COLLI POWRBANK XPRO SKID FRAME AND ENCLOSURE, INCLUDING ALL ENCLOSURE FITTINGS.WITH ELECTRONICS 4 COLLI REAR DOOR PANNELS HS CODE:730900 |