Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
HEAVY PARTS | 4 shipments |
HEAVY PART | 1 shipments |
HS Code | Shipments |
---|---|
851190 Ignition or starting equipment; used for spark-ignition or compression-ignition internal combustion engines; generators and cut outs used in conjunction with such engines : Ignition or starting equipment; parts of the equipment of heading no. 8511, for use in spark-ignition or compression-ignition internal combustion engines | 2 shipments |
870210 Vehicles; public transport passenger type : Vehicles; public transport type (carries 10 or more persons, including driver), with only compression-ignition internal combustion piston engine (diesel or semi-diesel), new or used | 2 shipments |
847930 Machinery and mechanical appliances; having individual functions, n.e.c. in this chapter : Machinery and mechanical appliances; presses for the manufacture of particle or fibre building board of wood or other ligneous materials and other machinery for treating wood or cork | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-04-29 | MFGTBNSFO4441218 | HEAVY PARTS | 2359.0 kg | 847930 | DESCRIPTION:BUILDING MATERIALS |
2022-09-17 | MFGTBNSFO4236290 | HEAVY PARTS | 2822.0 kg | 851190 | DIESAL ENGINE PARTS DIESAL ENGINE PARTS DIESAL ENGINE PARTS DIESAL ENGINE PARTS |
2022-03-13 | MFGTBNSFO4068520 | HEAVY PARTS | 3350.0 kg | 851190 | STC: DIESE ENGINE PARTS |
2021-08-13 | MFGTBNSFO3882861 | HEAVY PARTS | 3160.0 kg | 870210 | DIESEL ENGINE PARTS6 PCS COUNTED ACCROSS 6 PALLETS 8414.90SCAC - MFGTBNSF03882861 |
2021-02-16 | MFGTBNSFO3717864 | HEAVY PART | 3733.0 kg | 870210 | STC: DIESEL ENGINE PARTS |
2100 WILLIAMS ST |
---|