Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.19 | Average TEU per month: 0.38 |
Active Months: 3 | Average TEU per Shipment: 1.51 |
Shipment Frequency Std. Dev.: 0.40 |
Company Name | Shipments |
---|---|
TB | 3 shipments |
GILDON MANUFACTURING SDN BHD | 1 shipments |
HUZHOU KELAI NEW MATERIAL TECHNOLOG JINGHONGMINGCHENG LONGGUAN | 1 shipments |
ZHEJIANG LONGSEN LUMBERING CO LTD | 1 shipments |
HS Code | Shipments |
---|---|
440920 Wood (including strips, friezes for parquet flooring, not assembled), continuously shaped (tongued, grooved, v-jointed, beaded or the like) along any edges, ends or faces, whether or not planed, sanded or end-jointed | 4 shipments |
440500 Wood wool; wood flour : Wood; wood wool and wood flour | 1 shipments |
690490 Ceramic building bricks, floor blocks, support or filler tiles and the like : Ceramic flooring blocks, supports or filler tiles and the like (excluding building bricks) | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-12-14 | GCNLPKLNYC041746 | GILDON MANUFACTURING SDN BHD | 26000.0 kg | 690490 | ENGINEERED FLOORING |
2024-07-29 | WCIGHHSE4046058 | ZHEJIANG LONGSEN LUMBERING CO LTD | 4729.0 kg | 440920 | ENGINEERED WOOD FLOORING |
2024-06-27 | SFOKPNH24040251 | TB | 10283.0 kg | 440920 | ENGINEERED WOOD FLOORING POTB-KL2401-0601 |
2023-11-05 | ECUWYC23084758H | HUZHOU KELAI NEW MATERIAL TECHNOLOG JINGHONGMINGCHENG LONGGUAN | 490.0 kg | 440500 | WOOD STAIR TREADS |
2023-09-30 | SFOKPNH23080236 | TB | 10669.0 kg | 440920 | ENGINEERED WOOD FLOORING POTB-KL2302-24 |
2023-05-04 | SFOKPNH23030216 | TB | 19669.0 kg | 440920 | ENGINEERED WOOD FLOORING POKL2301-07 |