Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 1.06 | Average TEU per month: 2.33 |
Active Months: 8 | Average TEU per Shipment: 1.65 |
Shipment Frequency Std. Dev.: 1.24 |
Company Name | Shipments |
---|---|
SANDVIK MINING CONSTRUCTION | 12 shipments |
SANDVIK MINING AND CONSTRUCTION HARCOURT | 4 shipments |
SANDVIK MINING & CONSTRUCTION LOGIS | 2 shipments |
GUJARAT TECHNOCASTINGS PRIVATE LIMI NARODA | 1 shipments |
SANDVIK MINING & ROCK TECHNOLOGY | 1 shipments |
SANDVIK SMC LOGISTICS LTD | 1 shipments |
HS Code | Shipments |
---|---|
846719 Tools; for working in the hand, pneumatic, hydraulic or with self-contained electric or non-electric motor : Tools; for working in the hand, pneumatic, other than rotary type | 12 shipments |
392220 Sanitary ware; baths, shower-baths, sinks, wash-basins, bidets, lavatory pans, seats and covers, flushing cisterns and sanitary ware, of plastics : Plastics; lavatory seats and covers | 1 shipments |
590800 Textile wicks, woven, plaited or knitted; for lamps, stoves, lighters, candles or the like; incandescent gas mantles and tubular knitted gas mantle fabric therefor, whether or not impregnated : Textile wicks, woven, plaited or knitted; for lamps, stoves, lighters, candles or the like; incandescent gas mantles and tubular knitted gas mantle fabric therefor, whether or not impregnated | 1 shipments |
731512 Chain and parts thereof, of iron or steel : Chain; articulated link, (other than roller), of iron or steel | 1 shipments |
750120 Nickel mattes; nickel oxide sinters and other intermediate products of nickel metallurgy : Nickel; oxide sinters and other intermediate products of nickel metallurgy | 1 shipments |
842860 Lifting, handling, loading or unloading machinery; n.e.c. in heading no. 8425, 8426 or 8427 (e.g. lifts, escalators, conveyors, teleferics) : Teleferics, chair-lifts, ski-draglines, traction mechanisms for funiculars | 1 shipments |
843141 Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430 : Machinery parts; buckets, shovels, grabs and grips, for the machinery of heading no. 8426 and 8430 | 1 shipments |
847490 Machinery for sorting, screening, separating, washing, crushing, grinding, mixing or kneading earth, stone, ores in solid form, shaping, moulding machinery for solid mineral fuels : Machines, for sorting, screening, separating, washing, crushing etc mineral substances, for agglomerating, shaping or moulding solid fuels, ceramic pastes etc, for forming foundry moulds of sand; parts | 1 shipments |
853910 Lamps; electric filament or discharge lamps, including sealed beam lamp units and ultra-violet or infra-red lamps, arc lamps, light-emitting diode (LED) lamps : Lamps; sealed beam units | 1 shipments |
903130 Measuring or checking instruments, appliances and machines, n.e.c. or included in this chapter; profile projectors | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2025-02-01 | EXDO6980024527 | SANDVIK MINING & CONSTRUCTION LOGIS | 3800.0 kg | 590800 | MANTLE USED FOR MINING HTS: |
2025-02-01 | EXDO6980024569 | SANDVIK MINING & CONSTRUCTION LOGIS | 1574.0 kg | 731512 | CHAIN ROLLER HTS: |
2025-01-30 | DMALAMDA29758 | GUJARAT TECHNOCASTINGS PRIVATE LIMI NARODA | 235.0 kg | 847490 | PARTS FOR CRUSHING MACHINE |
2025-01-23 | DMALGOTA51914 | SANDVIK MINING CONSTRUCTION | 2310.0 kg | 846719 | MINING EQUIPMENT |
2024-11-13 | DMALGOTA50157 | SANDVIK MINING CONSTRUCTION | 6617.0 kg | 846719 | MINING EQUIPMENT |
2024-11-06 | DMALGOTA49770 | SANDVIK MINING CONSTRUCTION | 5382.0 kg | 846719 | MINING EQUIPMENT |
2024-09-12 | DMALGOTA48168 | SANDVIK MINING CONSTRUCTION | 6111.0 kg | 846719 | MINING EQUIPMENT |
2024-09-01 | DMALGOTA48013 | SANDVIK MINING CONSTRUCTION | 3616.0 kg | 846719 | MINING EQUIPMENT |
2024-06-19 | DMALGOTA46526 | SANDVIK MINING CONSTRUCTION | 2962.0 kg | 846719 | MINING EQUIPMENT |
2024-06-12 | DMALGOTA45880 | SANDVIK MINING CONSTRUCTION | 926.0 kg | 846719 | MINING EQUIPMENT |
2024-05-28 | DMALGOTA45226 | SANDVIK MINING CONSTRUCTION | 2552.0 kg | 846719 | MINING EQUIPMENT |
2024-05-01 | DMALRTMA91638 | SANDVIK MINING AND CONSTRUCTION HARCOURT | 856.0 kg | 842860 | BATTERY, TRACTION |
2024-04-18 | DMALGOTA43910 | SANDVIK MINING CONSTRUCTION | 7915.0 kg | 846719 | MINING EQUIPMENT |
2024-03-22 | DMALGOTA42867 | SANDVIK MINING CONSTRUCTION | 3395.0 kg | 846719 | MINING EQUIPMENT |
2024-03-20 | DMALRTMA89036 | SANDVIK MINING AND CONSTRUCTION HARCOURT | 12812.0 kg | 853910 | BEAM ASSEMBLY TF500-14 BEAM ASSEMBLY TF500-14 |
2024-03-20 | DMALRTMA89154 | SANDVIK MINING AND CONSTRUCTION HARCOURT | 13113.0 kg | 750120 | AXLE, INTERMEDIATE AXLE, INTERMEDIATE |
2024-03-03 | DMALGOTA42621 | SANDVIK MINING CONSTRUCTION | 4704.0 kg | 846719 | MINING EQUIPMENT |
2024-02-28 | DMALRTMA88637 | SANDVIK MINING AND CONSTRUCTION HARCOURT | 11946.0 kg | 392220 | COVER COVER |
2024-01-15 | DMALGOTA41293 | SANDVIK MINING CONSTRUCTION | 1088.0 kg | 846719 | MINING EQUIPMENT |
2023-07-16 | DMALPERA02214 | SANDVIK SMC LOGISTICS LTD | 430.0 kg | 843141 | PROFILE BAR - 2 X 330MM CENTRE HBL: PERA022 14 HS CODE: 843141 |
2023-04-11 | DMALPERA02100 | SANDVIK MINING & ROCK TECHNOLOGY | 590.0 kg | 903130 | PROFILE BAR - 1 X 420MM CENTRE HBL: 732690 |
877 WEST CROSSROADS PKWY ROMEOVILLE IL 60446 US |
---|