SOLARGIK LTD
SOLARGIK LTD's Shipments Over Time
Purchase Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.00 Average TEU per month: 0.00
Active Months: 0 Average TEU per Shipment: N/A
Shipment Frequency Std. Dev.: 0.00
Shipments By Companies
Company Name Shipments
HCT SUN INDIA PVT LTD 2 shipments
HMD MUHENDISLIK DAN PRO ENERJI MET MALIKOY BASKENT OSB 2 shipments
SOLARGIK LTD 2 shipments
HMD METAL VE ENERJI AS MALIKOY BASKENT OSB 1 shipments
Shipments By HS Code
HS Code Shipments
030192 Fish; live : Fish; live, eels (Anguilla spp.) 3 shipments
841919 Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters : Heaters; instantaneous or storage water heaters, non-electric, other than instantaneous gas water heaters 2 shipments
750720 Nickel; tubes, pipes and tube or pipe fittings (e.g. couplings, elbows, sleeves) : Nickel; tube and pipe fittings 1 shipments
903180 Measuring or checking instruments, appliances and machines, n.e.c. or included in this chapter; profile projectors : Instruments, appliances and machines; for measuring or checking n.e.c. in chapter 90 1 shipments
to show market analysis.
Similar Companies
to see more.
Latest Shipments
Arrival Date Bill Of Lading Shipper Weight HS Code Description
2023-07-06 ICLJ716402 SOLARGIK LTD 9341.0 kg 841919 SOLAR TRAKER PARTS
2023-07-02 ICLJ717303 SOLARGIK LTD 10100.0 kg 841919 SOLAR TRACKER PARTS
2023-06-14 ONEYISTD06110A01 HMD METAL VE ENERJI AS MALIKOY BASKENT OSB 70860.0 kg 030192 SPP CONSTRUCTION COMPONENT SPP CONSTRUCTION COMPONENT SPP CONSTRUCTION COMPONENT SPP CONSTRUCTION COMPONENT
2023-05-11 ONEYISTD04059A01 HMD MUHENDISLIK DAN PRO ENERJI MET MALIKOY BASKENT OSB 19000.0 kg 030192 SPP CONSTRUCTION COMPONENT
2023-04-28 ONEYISTD03327A01 HMD MUHENDISLIK DAN PRO ENERJI MET MALIKOY BASKENT OSB 61218.0 kg 030192 SPP CONSTRUCTION COMPONENT SPP CONSTRUCTION COMPONENT SPP CONSTRUCTION COMPONENT
2023-03-13 AIRLNMU90457 HCT SUN INDIA PVT LTD 14260.0 kg 903180 SOLAR TRACKER BEAM CONNECTOR BRACKET- TT BRACLON BEARING SYSTEM 90 ASM
2023-03-13 AIRLNMU90458 HCT SUN INDIA PVT LTD 19895.0 kg 750720 SOLAR TRACKER SQ TUBE 90 X90
Contact information
Search contact information on RocketReach
Other address
MM 60 SR 447 RODEX CREEK RD
NORTH VALLEY SOLAR MM 60 SR 447 RODEX CREEK RD GERLACH NV 89412
NORTH VALLEY SOLAR RODEO CREEK RD GERLACH NV 89412 US