Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.08 | Average TEU per month: 0.62 |
Active Months: 1 | Average TEU per Shipment: 7.50 |
Shipment Frequency Std. Dev.: 0.29 |
Company Name | Shipments |
---|---|
DE BOER MACHINES NEDERLAND B V | 3 shipments |
COSMEC SRL | 1 shipments |
HS Code | Shipments |
---|---|
292249 Oxygen-function amino-compounds : Amino-acids, other than those containing more than one kind of oxygen function, their esters; salts thereof, excluding lysine, glutamic acid, anthranalic acid and tilidine, their esters and salts thereof | 1 shipments |
843420 Milking machines and dairy machinery : Dairy machinery | 1 shipments |
854311 Electrical machines and apparatus; having individual functions, not specified or included elsewhere in this chapter | 1 shipments |
903083 Instruments, apparatus for measuring, checking electrical quantities not meters of heading no. 9028; instruments, apparatus for measuring or detecting alpha, beta, gamma, x-ray, cosmic and other radiations | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-06-11 | MAEU239177260 | COSMEC SRL | 27470.02 kg | 292249 | -REVAMPING OF THE CHAMBER DRYE R AT PANT 3 CHAMBER DRYER HO T AIR GENERATORS INTERNAL VEN TILATION PARTIAL SHIPMENT HOT AIR SUPPLY PIPE SET - PARTIAL SHIPMENT -STACKING LINE FOR YOUR PLANT 3 NEW STACKING LIN E FOR YOUR PLANT 3 PARTIAL S HIPMENT -NEW LINE FOR THE TRA NSFER AND DECORATION OF 1 OR 2 ROWS OF BRICKS CONVEYOR FO R THE NEW ENGOBE LINE PARTIA L SHIPMENT -INTERNAL VENTILAT ION PARTIAL SHIPMENT -DRYER ELECTRIC INSTALLATION PARTI AL SHIPMENT FREIGHT PREPAID -REVAMPING OF THE CHAMBER DRYE R AT PANT 3 CHAMBER DRYER HO T AIR GENERATORS INTERNAL VEN TILATION PARTIAL SHIPMENT HOT AIR SUPPLY PIPE SET - PARTIAL SHIPMENT -STACKING LINE FOR YOUR PLANT 3 NEW STACKING LIN E FOR YOUR PLANT 3 PARTIAL S HIPMENT -NEW LINE FOR THE TRA NSFER AND DECORATION OF 1 OR 2 ROWS OF BRICKS CONVEYOR FO R THE NEW ENGOBE LINE PARTIA L SHIPMENT -INTERNAL VENTILAT ION PARTIAL SHIPMENT -DRYER ELECTRIC INSTALLATION PARTI AL SHIPMENT FREIGHT PREPAID -REVAMPING OF THE CHAMBER DRYE R AT PANT 3 CHAMBER DRYER HO T AIR GENERATORS INTERNAL VEN TILATION PARTIAL SHIPMENT HOT AIR SUPPLY PIPE SET - PARTIAL SHIPMENT -STACKING LINE FOR YOUR PLANT 3 NEW STACKING LIN E FOR YOUR PLANT 3 PARTIAL S HIPMENT -NEW LINE FOR THE TRA NSFER AND DECORATION OF 1 OR 2 ROWS OF BRICKS CONVEYOR FO R THE NEW ENGOBE LINE PARTIA L SHIPMENT -INTERNAL VENTILAT ION PARTIAL SHIPMENT -DRYER ELECTRIC INSTALLATION PARTI AL SHIPMENT FREIGHT PREPAID -REVAMPING OF THE CHAMBER DRYE R AT PANT 3 CHAMBER DRYER HO T AIR GENERATORS INTERNAL VEN TILATION PARTIAL SHIPMENT HOT AIR SUPPLY PIPE SET - PARTIAL SHIPMENT -STACKING LINE FOR YOUR PLANT 3 NEW STACKING LIN E FOR YOUR PLANT 3 PARTIAL S HIPMENT -NEW LINE FOR THE TRA NSFER AND DECORATION OF 1 OR 2 ROWS OF BRICKS CONVEYOR FO R THE NEW ENGOBE LINE PARTIA L SHIPMENT -INTERNAL VENTILAT ION PARTIAL SHIPMENT -DRYER ELECTRIC INSTALLATION PARTI AL SHIPMENT FREIGHT PREPAID -REVAMPING OF THE CHAMBER DRYE R AT PANT 3 CHAMBER DRYER HO T AIR GENERATORS INTERNAL VEN TILATION PARTIAL SHIPMENT HOT AIR SUPPLY PIPE SET - PARTIAL SHIPMENT -STACKING LINE FOR YOUR PLANT 3 NEW STACKING LIN E FOR YOUR PLANT 3 PARTIAL S HIPMENT -NEW LINE FOR THE TRA NSFER AND DECORATION OF 1 OR 2 ROWS OF BRICKS CONVEYOR FO R THE NEW ENGOBE LINE PARTIA L SHIPMENT -INTERNAL VENTILAT ION PARTIAL SHIPMENT -DRYER ELECTRIC INSTALLATION PARTI AL SHIPMENT FREIGHT PREPAID |
2023-05-31 | OOLU214049823001 | DE BOER MACHINES NEDERLAND B V | 2350.0 kg | 903083 | 13-42 SPRAYING DEVICE & ELECTRICAL CONTROLE SYSTEM |
2021-04-20 | FFPV31030370 | DE BOER MACHINES NEDERLAND B V | 1026.0 kg | 854311 | NEW EQUIPMENT FOR THE PRODUCTION OF WATERSTRUCK BRICKS |
2021-02-14 | HLCURTM210111515 | DE BOER MACHINES NEDERLAND B V | 4350.0 kg | 843420 | MACHINERY |