Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.08 | Average TEU per month: 0.71 |
Active Months: 1 | Average TEU per Shipment: 8.50 |
Shipment Frequency Std. Dev.: 0.29 |
Company Name | Shipments |
---|---|
SOLIBRA LOJISTIK HIZMETLERI A S | 1 shipments |
HS Code | Shipments |
---|---|
840212 Boilers; steam or other vapour generating (other than central heating hot water boilers, capable also of producing low pressure steam), super heated water boilers : Boilers; watertube boilers with a steam production not exceeding 45t per hour | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-05-17 | MAEU238427302 | SOLIBRA LOJISTIK HIZMETLERI A S | 57120.94 kg | 840212 | ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D ENGINEERING PROCUREMENT CONSTR UCTION(EPC) SERVICES FOR TRAN SMISSION LINE AND SUBSTATION F OR GUYANA INTEGRATED NGL PLANT AND 300 MWE CCGT POWER PLANT FOREIGN ORIGIN AS PER CONTRAC T NO OPM/GTE/RFP/T-S/2022 01 DATED 19TH JULY 2023. MATERIAL OUTDOOR VOLTAGE TRANSFORMER AS PER PO NO. 7400003104 DATED 29.09.2023 TERMS OF SHIPMENT EXW ANKARA TURKEY INCOTERMS 2 020 LETTER OF CREDIT NO 001 LM01240810011 ISSUE DATE: 2403 21 ISSUE BANK: YES BANK LIMITE D |