USA COAST GUARD SFLC
USA COAST GUARD SFLC's Shipments Over Time
Purchase Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.08 Average TEU per month: 0.12
Active Months: 1 Average TEU per Shipment: 1.50
Shipment Frequency Std. Dev.: 0.29
Shipments By Companies
Company Name Shipments
ANDRITZ HYDRO GMBH 3 shipments
GE ENERGY POWER CONVERSION UK LTD 1 shipments
Shipments By HS Code
HS Code Shipments
841090 Turbines; hydraulic water wheels and regulators therefor : Turbines; parts of hydraulic turbines and water wheels, including regulators 1 shipments
843031 Moving, grading, levelling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals, or ores; pile drivers and extractors; snow ploughs and snow blowers : Coal or rock cutters and tunnelling machinery; self-propelled 1 shipments
902230 X-ray, alpha, beta, gamma radiation apparatus; x-ray tubes, x-ray generators, high tension generators, control panels and desks, screens, examination or treatment tables, chairs and the like : X-ray tubes 1 shipments
980100 1 shipments
to show market analysis.
Similar Companies
to see more.
Latest Shipments
Arrival Date Bill Of Lading Shipper Weight HS Code Description
2024-11-25 GOLA276951815271 ANDRITZ HYDRO GMBH 6868.0 kg 843031 TOTAL DELIVERY OF PROPELLER HUB ASSEMBLY, PORT RH STBD LH FOR 270-WMEC CUTTERS AS PER
2023-02-17 AROFGBSOU2300101 GE ENERGY POWER CONVERSION UK LTD 104100.0 kg 902230 1 PCS MOTOR 99000 KGS 186.329 CBM 733 X 620 X 410 CM PIECE1_1 1 PCS COOLER 5100 KGS 19.393 CBM 425 X 270 X 169 CM PIECE2_2
2023-01-15 SHKK276946058324 ANDRITZ HYDRO GMBH 3426.0 kg 980100 TOTAL DELIVERY OF 1 PROPELLER HUB COMPLETE, CW DIA. 850 WITHOUT PROPELLER BLADES AND BLAD
2021-08-04 SHKK276942330615 ANDRITZ HYDRO GMBH 6852.0 kg 841090 TOTAL DELIVERY OF SPARE PARTS FOR PROPELLER HUB FOR PROJECT 270-WMEC HS-CODE 841090
Contact information
Search contact information on RocketReach
Other address
2401 HAWKINS POINT ROAD BALTIMORE MD 21226 US