2022-11-08 |
SMMBSSHA6038783 |
NANTONG KINEDYNE LIMITED |
34080.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH HEAD ASSEMBLY BEAM LATCH |
2022-10-15 |
SMMBSSHA6025070 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2022-10-14 |
SMMBSSHA6025108 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM |
2022-10-03 |
SMMBSSHA5989925 |
NANTONG KINEDYNE LIMITED |
69048.0 kg |
440200
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO: WTUSPON039403NO WOOD PACKIN G MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO: WTUSPON039403NO WOOD PACKIN G MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO: WTUSPON039403NO WOOD PACKIN G MATERIAL ISUSED IN THE SHIPMENT. |
2022-09-26 |
SMMBSSHA6003976 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM |
2022-09-19 |
SMMBSSHA6010204 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO#WTUSPON041402NO WOOD PACKING M ATERIAL IS USED IN THE SHIPMENT. |
2022-09-10 |
SMMBSSHA6003962 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO#WTUSPON041402NO WOOD PACKING M ATERIAL IS USED IN THE SHIPMENT. |
2022-08-24 |
SMMBSSHA5976388 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY, BEAM LATCHPO:WTUSPON039152 NO WOOD PACKING MATERIAL ISUSED IN THE SHIP MENT. |
2022-08-12 |
SMMBSSHA5976406 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. |
2022-08-07 |
SMMBSSHA5950601 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY, BEAM LATCHPO:WTUSPON039152 NO WOOD PACKING MATERIAL ISUSED IN THE SHIP MENT. |
2022-08-06 |
SMMBSSHA5937373 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845699
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. HEAD ASSEMBLY, BEAM LATCHPO:WTUSPON039152 NO WOOD PACKING MATERIAL ISUSED IN THE SHIP MENT. |
2022-07-16 |
SMMBSSHA5930650 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845910
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II HEAD ASSEMBLNO WOOD PACKING MATERIAL ISUSED IN THE SHIP MENT. HEAD ASSEMBLY,K2 KAPTIVE BEAM II HEAD ASSEMBL |
2022-06-30 |
SMMBSSHA5916451 |
NANTONG KINEDYNE LIMITED |
51174.0 kg |
853910
|
BEAM HEAD ASSEMBLY, KAPTIVE BEAM BEAM HEAD ASSEMBLY, KAPTIVE BEAM BEAM HEAD ASSEMBLY, KAPTIVE BEAM |
2022-06-18 |
SMMBSSHA5910025 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY, BEAM LATCH |
2022-05-26 |
SMMBSSHA5839864 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM |
2022-05-21 |
SMMBSSHA5870037 |
NANTONG KINEDYNE LIMITED |
33300.0 kg |
845910
|
HEAD ASSEMBLY, BEAM LATCH HEAD ASSEMBLY, BEAM LATCH |
2022-05-11 |
SMMBSSHA5832102 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2022-05-07 |
SMMBSSHA5861830 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845910
|
HEAD ASSEMBLY,K2 KAPTIVE BEAM II,NUT ON THE LEFT SIDEPO:WTUSPON039029NO WOOD PACKING MATERIAL ISUSED IN THE SHIPMENT. K2 EXTENDED HEAD BEAM ASSEMBLY |
2022-04-09 |
SMMBSSHA5817481 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845910
|
HEAD ASSEMBLY, BEAM LATCH HEAD ASSEMBLY, BEAM LATCH |
2022-04-05 |
SMMBSSHA5806773 |
NANTONG KINEDYNE LIMITED |
33300.0 kg |
845910
|
HEAD ASSEMBLY, BEAM LATCH HEAD ASSEMBLY, BEAM LATCH |
2022-03-24 |
SMMBSSHA5776162 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2022-03-15 |
SMMBSSHA5793050 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-12-30 |
SMMBSSHA5709165 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM |
2021-12-30 |
SMMBSSHA5709126 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-12-27 |
SMMBSSHA5691379 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
K2 EXTENDED HEAD BEAM ASSEMBLY |
2021-12-27 |
SMMBSSHA5709182 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-12-12 |
SMMBSSHA5686397 |
NANTONG KINEDYNE LIMITED |
34524.0 kg |
845910
|
K2 EXTENDED HEAD BEAM ASSEMBLY K2 EXTENDED HEAD BEAM ASSEMBLY |
2021-12-11 |
SMMBSSHA5662140 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
K2 EXTENDED HEAD BEAM ASSEMBLY |
2021-11-28 |
SMMBSSHA5667569 |
SHANGHAI CARRATE ENTERPRISE CO LTD |
2330.0 kg |
846719
|
HAND TOOLS |
2021-11-25 |
SMMBSSHA5654649 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-11-19 |
SMMBSSHA5657840 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-11-18 |
SMMBSSHA5654655 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-10-23 |
SMMBSSHA5607339 |
NANTONG KINEDYNE LIMITED |
16650.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-10-18 |
SMMBSSHA5601910 |
NANTONG KINEDYNE LIMITED |
34080.0 kg |
853910
|
BEAM HEAD ASSEMBLY KAPTIVE BEAM BEAM HEAD ASSEMBLY KAPTIVE BEAM |
2021-10-16 |
SMMBSSHA5630456 |
NANTONG KINEDYNE LIMITED |
33300.0 kg |
853910
|
HEAD BEAM ASSEMBLY BEAM LATCH HEAD BEAM ASSEMBLY BEAM LATCH |
2021-09-28 |
SMMBSSHA5590003 |
NANTONG KINEDYNE LIMITED |
33300.0 kg |
853910
|
BEAM LATCH BEAM ASSEMBLY BEAM LATCH BEAM ASSEMBLY |
2021-09-26 |
SMMBSSHA5569823 |
NANTONG KINEDYNE LIMITED |
33744.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH HEAD ASSEMBLY BEAM LATCH |
2021-08-31 |
SMMBSSHA5557389 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM HEAD ASSEMBLY KAPTIVE BEAM |
2021-08-28 |
SMMBSSHA5556681 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM II |
2021-08-20 |
SMMBSSHA5557351 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM II NUT ON THE LEFT SIDE |
2021-08-16 |
SMMBSSHA5544948 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD AWWEMBLY KAPTIVE BEAM NUT ON THE LEFT |
2021-08-16 |
SMMBSSHA5532312 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845910
|
K2 EXTENDED HEAD BEAM ASSEMBLY K2 EXTENDED HEAD BEAM ASSEMBLY |
2021-07-31 |
SMMBSSHA5506399 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM |
2021-07-29 |
SMMBSSHA5502959 |
NANTONG KINEDYNE LIMITED |
17135.0 kg |
845910
|
K2 EXTENDED HEAD BEAM ASSEMBLY |
2021-07-22 |
SMMBSSHA5488435 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM HEAD ASSEMBLY KAPTIVE BEAM |
2021-06-27 |
SMMBSSHA5488421 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH |
2021-06-27 |
SMMBSSHA5477390 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM |
2021-06-22 |
SMMBSSHA5477350 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM HEAD ASSEMBLY KAPTIVE BEAM |
2021-06-16 |
SMMBSSHA5449955 |
NANTONG KINEDYNE LIMITED |
34188.0 kg |
845910
|
HEAD ASSEMBLY BEAM LATCH HEAD ASSEMBLY BEAM LATCH |
2021-06-13 |
SMMBSSHA5471189 |
NANTONG KINEDYNE LIMITED |
17094.0 kg |
845910
|
HEAD ASSEMBLY KAPTIVE BEAM |