Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
GOLLWITZER GMBH | 1 shipments |
WARD & BURKE CONSTRUCTION LTD | 1 shipments |
WARD AND BURKE CONSTRUCTION LTD | 1 shipments |
HS Code | Shipments |
---|---|
441840 Builders' joinery and carpentry of wood, including cellular wood panels, assembled flooring panels, shingles and shakes : Wood; shuttering for concrete constructional work | 1 shipments |
843420 Milking machines and dairy machinery : Dairy machinery | 1 shipments |
846719 Tools; for working in the hand, pneumatic, hydraulic or with self-contained electric or non-electric motor : Tools; for working in the hand, pneumatic, other than rotary type | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2022-01-16 | HLCULIV211172781 | WARD AND BURKE CONSTRUCTION LTD | 36600.0 kg | 846719 | TUNNEL CONSTRUCTION EQUIPMENT TUNNEL CONSTRUCTION EQUIPMENT |
2021-07-19 | WLWHDE2143634 | GOLLWITZER GMBH | 2500.0 kg | 441840 | UNPACKED OR UNPACKAGED FORMWORK EQUIPMENT FO R JACKING PIPES DIAMETER ID1200 OD1490 E MAIL RACHAEL@PROJECT TRANSPORT.US TEL 62 6 303 4500 FINAL UNLOADING ADRESS LANGLEY CONCRETE GROUP OF COMPANIES 7580 CANNOR ROAD CHILLIWACK BC V2R 0B6 CANADA ONCARRIAGE TO DOOR CHILLIWACK BC THROUGH PROJECT TRANSP ORT |
2021-07-18 | HLCULIV210522359 | WARD & BURKE CONSTRUCTION LTD | 4682.0 kg | 843420 | SPARES FOR TUNNEL CONSTRUCTION MACHINERY |