Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.12 | Average TEU per month: 0.04 |
Active Months: 2 | Average TEU per Shipment: 0.23 |
Shipment Frequency Std. Dev.: 0.34 |
Company Name | Shipments |
---|---|
HAINAN GOLDEN SHELL CO LTD | 1 shipments |
HANGZHOU WELL TRANS SUPPLY CHAIN MA | 1 shipments |
HS Code | Shipments |
---|---|
730210 Railway or tramway track constructions of iron or steel; rails, check and track rails, switch blades, crossing frogs, point rods, sleepers, fish-plates, chair wedges, sole plates, bedplates, ties and the like : Iron or steel, railway or tramway track construction material; rails | 1 shipments |
730290 Railway or tramway track constructions of iron or steel; rails, check and track rails, switch blades, crossing frogs, point rods, sleepers, fish-plates, chair wedges, sole plates, bedplates, ties and the like : Iron or steel, railway or tramway track construction material; n.e.c. in heading no. 7302 | 1 shipments |
Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-10-15 | DWCH24HWS1038949 | HANGZHOU WELL TRANS SUPPLY CHAIN MA | 2.0 kg | 730290 | HANDRAIL MATERIAL: CARBON STEEL CONSTRUCTION |
2024-05-30 | TZWH62404157819 | HAINAN GOLDEN SHELL CO LTD | 2.0 kg | 730210 | HANDRAIL |
3500 AMHERST ST TURQUOISE DOOR |
---|