YUEQING YIHUA NEW ENERGY TECH CO
YUEQING YIHUA NEW ENERGY TECH CO's Shipments Over Time
Purchase Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.00 Average TEU per month: 0.00
Active Months: 0 Average TEU per Shipment: N/A
Shipment Frequency Std. Dev.: 0.00
Shipments By Companies
Company Name Shipments
YUEQING YIHUA NEW ENERGY TECHNOLOGY 1 shipments
Shipments By HS Code
HS Code Shipments
860290 Rail locomotives; (other than those of heading no. 8601), locomotive tenders : Rail locomotives and locomotive tenders; other than diesel-electric powered 11 shipments
950320 Tricycles, scooters, pedal cars and similar wheeled toys; dolls' carriages; dolls; other toys; reduced-size (scale) models and similar recreational models, working or not; puzzles of all kinds 4 shipments
848330 Transmission shafts (including cam and crank) and cranks; bearing housings and plain shaft bearings; gears and gearing; ball or roller screws; gear boxes and other speed changers; flywheels and pulleys; clutches and shaft couplings : Bearing housings, not incorporating ball or roller bearings and plain shaft bearings 3 shipments
401699 Articles of vulcanised rubber other than hard rubber, n.e.c. in chapter 40 : Rubber; vulcanised (other than hard rubber), articles n.e.c. in heading no. 4016, of non-cellular rubber 2 shipments
091040 Ginger, saffron, tumeric (curcuma), thyme, bay leaves, curry and other spices 1 shipments
190430 Prepared foods obtained by swelling or roasting cereals or cereal products (e.g. corn flakes); cereals (other than maize (corn)) in grain form or in the form of flakes or other worked grains (not flour and meal), pre-cooked or otherwise prepared, n.e.c. : Prepared foods obtained by the swelling or roasting of cereals or cereal products (e.g. corn flakes); cereals, not maize (corn), in grain form or in the form of flakes or other worked grains, from bulgur wheat 1 shipments
to show market analysis.
Similar Companies
to see more.
Latest Shipments
Arrival Date Bill Of Lading Shipper Weight HS Code Description
2022-07-09 PLKQNB22050216 22885.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE
2022-07-09 PLKQNB22050217 22885.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE
2022-07-09 PLKQNB22060030 45770.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE
2022-06-17 EFSVMZ3019550J 331.0 kg 860290 SUPPLEMENTAL RAIL
2022-06-08 PLKQNB22050138 22885.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE
2022-06-08 PLKQNB22050139 14023.0 kg 848330 BEARING HOUSING ASSEMBLY/EXTRA HEAVY/MODULE MOUNTING RAIL ASSEMBLY/CH STRAP SADDLE
2022-06-08 PLKQNB22050027 22885.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY STRAP SADDLE
2022-06-08 PLKQNB22050028 17944.0 kg 848330 BEARING HOUSING ASSEMBLY/EXTRA HEAVY/MODULE MOUNTING RAIL ASSEMBLY/CH STRAP SADDLE
2022-06-07 PLKQNB22050049 22885.0 kg 860290 MODULE MOUNTING RAIL SUBASSEMBLY/STRAP SADDLE
2022-05-24 PLKQNB22040179 12213.0 kg 848330 BEARING HOUSING ASSEMBLY/SMART MODULE/MOUNTING RAIL AND SPC BRACKET/SUBASSEMBLY/BOLT/CAP/SOCKET HEAD/END CAP/PLASTIC/
2022-04-26 PLKQSH22047208 43949.0 kg 860290 SHARED RAIL ASSEMBLY/CH STRAP SHARED RAIL ASSEMBLY/CH STRAP
2022-04-26 PLKQSH22047209 86217.0 kg 860290 STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING LOWER DAMPER MOUNT ASSEMBLYPIER HOLESHIGH S LOPESIDE 1SIDE 2SMART MODULEMOUNTING RAIL AND SPC BRACKETSUBASSEMBLYDOUBLE UPPER DAM PER MOUNT ASSEMBLYSLEW GEAR MOUNT ASSEMBLYH IGH SLOPESHARED RAIL ASSEMBLYCH STRAPCH ST RAP SADDLE STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING LOWER DAMPER MOUNT ASSEMBLYPIER HOLESHIGH S LOPESIDE 1SIDE 2SMART MODULEMOUNTING RAIL AND SPC BRACKETSUBASSEMBLYDOUBLE UPPER DAM PER MOUNT ASSEMBLYSLEW GEAR MOUNT ASSEMBLYH IGH SLOPESHARED RAIL ASSEMBLYCH STRAPCH ST RAP SADDLE STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING LOWER DAMPER MOUNT ASSEMBLYPIER HOLESHIGH S LOPESIDE 1SIDE 2SMART MODULEMOUNTING RAIL AND SPC BRACKETSUBASSEMBLYDOUBLE UPPER DAM PER MOUNT ASSEMBLYSLEW GEAR MOUNT ASSEMBLYH IGH SLOPESHARED RAIL ASSEMBLYCH STRAPCH ST RAP SADDLE STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING LOWER DAMPER MOUNT ASSEMBLYPIER HOLESHIGH S LOPESIDE 1SIDE 2SMART MODULEMOUNTING RAIL AND SPC BRACKETSUBASSEMBLYDOUBLE UPPER DAM PER MOUNT ASSEMBLYSLEW GEAR MOUNT ASSEMBLYH IGH SLOPESHARED RAIL ASSEMBLYCH STRAPCH ST RAP SADDLE
2022-04-26 PLKQSH22047211 61921.0 kg 860290 BEARING HOUSING ASSEMBLYINTEGRATED SEISMIC B USHINGMART MODULEMOUNTING RAIL AND SPC BRAC KETSUBASSEMBLYSLEW GEAR MOUNT ASSEMBLYHIGH SLOPELOWER DAMPER MOUNT ASSEMBLYPIER HOLES DOUBLE UPPER MOUNT ASSEMBLYFIRST RAIL MOUNT ASSEMBLYSUPPLEMENTAL RAIL BEARING HOUSING ASSEMBLYINTEGRATED SEISMIC B USHINGMART MODULEMOUNTING RAIL AND SPC BRAC KETSUBASSEMBLYSLEW GEAR MOUNT ASSEMBLYHIGH SLOPELOWER DAMPER MOUNT ASSEMBLYPIER HOLES DOUBLE UPPER MOUNT ASSEMBLYFIRST RAIL MOUNT ASSEMBLYSUPPLEMENTAL RAIL BEARING HOUSING ASSEMBLYINTEGRATED SEISMIC B USHINGMART MODULEMOUNTING RAIL AND SPC BRAC KETSUBASSEMBLYSLEW GEAR MOUNT ASSEMBLYHIGH SLOPELOWER DAMPER MOUNT ASSEMBLYPIER HOLES DOUBLE UPPER MOUNT ASSEMBLYFIRST RAIL MOUNT ASSEMBLYSUPPLEMENTAL RAIL
2022-04-26 PLKQSH22047210 47496.0 kg 860290 STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING STAMPED BHA RAIL ASSEMBLYEXTRA HEAVYBEARING HOUSING ASSEMBLYINTEGRATED SEISMIC BUSHING
2022-04-05 PLKQSH22037253 17661.0 kg 401699 SMART MODULEMOUNTING RAIL AND SPC BRACKETSU BASSEMBLYLOWER DAMPER MOUNT ASSEMBLYPIER HO LESHIGH SLOPEDOUBLE UPPER DAMPER MOUNT ASSE MBLYSPC ANTENNA MOUNT V2 SUBASSEMBLYBOLTCA PSOCKET HEADNUTSLEW GEAR MOUNT ASSEMBLYEN D CAPPLASTIC
2022-04-04 PLKQSH22037243 6036.0 kg BOLTNUTHEXSERRATED FLANGEWSHR
2021-12-14 PLKQSH21127210 10123.0 kg 950320 LOWER ACTUATOR MOUNT ASSEMBLY/HIGH SLOPE/DISTRIBUTED DRIVE/CONTROLLER MOUNT/EXTENSION ASSEMBLY/SHCS
2021-05-27 PLKQSH21047210 6354.0 kg 950320 LOWER DAMPER MOUNT ASSEMBLY HDG HARDWARE
2021-05-18 PLKQSH21045061 19423.0 kg 950320 UPPER ACTUATOR MOUNT ASSEMBLY/DRIVE SHAFT HANGER ASSEMBLY/CONTROLLER MOUNT ASSEMBLY/ANTENNA MOUNT ASSEMBLY
2021-05-02 PLKQSH21047213 88593.0 kg 091040 TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV TORQUE TUBE HOLE SPACING 7 MODULE BAY PRE GALV
2021-04-27 PLKQSH21047227 58224.0 kg 190430 TORQUE TUBE/PRE-GALV TORQUE TUBE/PRE-GALV TORQUE TUBE/PRE-GALV
2021-04-24 PLKQSH21037258 YUEQING YIHUA NEW ENERGY TECHNOLOGY 2455.0 kg 401699 LOWER DAMPER MOUNT
2021-04-09 PLKQSH21037261 10510.0 kg 950320 LOWER DAMPER MOUNT ASSEMBLY HDG HARDWARE
Contact information
Search contact information on RocketReach
Other address
RM 1601 BLDG 1 XUYANG RDYUEQING FN 325606
RM 1601 BLDG 1 XUYANG RD YUEQING CHINA
RM 1601 BLDG 1 XUYANG RD YUEQING F N YUEQING ZHEJIANG CHINA
RM#1601 BLDG 1 XUYANG RD YUEQING FN 325606