Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.11 | Average TEU per month: 0.08 |
Active Months: 2 | Average TEU per Shipment: 0.50 |
Shipment Frequency Std. Dev.: 0.32 |
Company Name | Shipments |
---|---|
ASAHI AMERICA CORP | 3 shipments |
FASTENER EQUIPMENT CORP | 1 shipments |
OBARA CORP | 1 shipments |
RIGHTWAY FASTENERS INC | 1 shipments |
HS Code | Shipments |
---|---|
981800 | 3 shipments |
846490 Machine-tools; for working stone, ceramics, concrete, asbestos-cement or like mineral materials or for cold working glass, (other than sawing, grinding or polishing machines) | 1 shipments |
846694 Machine-tools; parts and accessories, for the machines of heading no. 8462 or 8463, n.e.c. in heading no. 8466 | 1 shipments |
851680 Resistors; electric heating, other than those of heading no. 8545 | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2025-01-29 | TSJLYLJ24374163 | ASAHI AMERICA CORP | 2078.0 kg | 846694 | SPARE PARTS FOR COLD HEADER HS CODE8466.94 |
2024-06-25 | ISWN212024037301 | OBARA CORP | 61730.0 kg | 851680 | ASAHI SUNAC PARTS FORMER |
2024-01-17 | TSJLYLJ23351010 | ASAHI AMERICA CORP | 772.0 kg | 981800 | SPARE PARTS FOR COLD HEADER |
2022-12-17 | TSJLYLS22063235 | RIGHTWAY FASTENERS INC | 574.0 kg | 981800 | SPARE PARTS FOR COLD HEADER |
2022-05-31 | TSJLYLS22022378 | ASAHI AMERICA CORP | 1978.0 kg | 981800 | SPARE PARTS FOR COLD HEADER |
2020-12-01 | ISWN212020086311 | FASTENER EQUIPMENT CORP | 7720.0 kg | 846490 | COLD HEADER MACHINE |
5050 ASAHIMAE-CHO |
---|
5050 ASAHIMAE-CHO |
5050 ASAHIMAE-CHO OWARIASAHI |