Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.18 | Average TEU per month: 0.96 |
Active Months: 3 | Average TEU per Shipment: 3.83 |
Shipment Frequency Std. Dev.: 0.39 |
Company Name | Shipments |
---|---|
GLEN GERY ADEL PLANT | 2 shipments |
GLEN GERY CORPORATE OFFICE | 1 shipments |
HS Code | Shipments |
---|---|
842240 Machinery; for packing or wrapping | 1 shipments |
842320 Weighing machines; scales for continuous weighing of goods on conveyors | 1 shipments |
960719 Slide fasteners; other than those fitted with chain scoops of base metal | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-07-24 | HLCUSYDOF03496AA | GLEN GERY ADEL PLANT | 4110.0 kg | 842320 | POWERED ROLLER CONVEYORS POWERED ROLLER CONVEYORS, HOT KNIVES CONVEYOR - ASSEMBLY |
2024-03-23 | HLCUSYDOB01699AA | GLEN GERY ADEL PLANT | 80660.0 kg | 960719 | FENCE PANELS, POSTS, LIGHT CURTAIN POST, SWING GATE ASSEMBLIES, SLIDE GATE FRAMES, SLIDE GATE PANELS, SLIDE GATE TRACK,, BC SAFETY GATES, GEARMOTOR, FITTINGS, FASTENERS ETC. MCC1 (ELECTRICAL EQUIPMENT )MCC2, MCC 3 (ELECTRICAL EQUIPMENT) MAGAZINE ASSEMBLY - LINE 1 BC HEAD - LINE 1 MAGAZINE ASSEMBLY - LINE 2 BC HEAD - LINE 2 BC BASE - LINE 1 BC BASE - LINE 2 ROBOT BASE - LINE 2 BC MAST SLAT CONVEYOR TOP RAIL 8M CONVEYOR PUSHER LINE 1 CONVEYOR ASSEMBLY LINE 1 STEEL FRAME WITH BOXES WRAPPED ON TOP CONVEYOR PUSHER LINE 2CONVEYOR ASSEMBLY LINE 2STEEL FRAME WITH BOXES WRAPPED ON TOP |
2023-12-02 | MAEU231896388 | GLEN GERY CORPORATE OFFICE | 7180.03 kg | 842240 | 14 PCS, MACHINERY - STRAPPING MACHINE, STRAP DISPENSER ROLLS, STRAPPING HE ADS, ELECTRICAL CONTROL CABINETS |