Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
GE STEAM POWER INC | 2 shipments |
HS Code | Shipments |
---|---|
391733 Plastics; tubes, pipes and hoses thereof, other than those of item no. 3917.31, not reinforced or otherwise combined with other materials, with fittings | 1 shipments |
741121 Copper; tubes and pipes, of copper-zinc base alloys (brass) | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2021-11-21 | SQSTSHAG505396 | GE STEAM POWER INC | 1817.0 kg | 741121 | SEAMLESS STEELTUBE |
2021-04-30 | NPSCSHSEL2100619 | GE STEAM POWER INC | 114701.0 kg | 391733 | STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . STRAIGHT BOILER TUBES MATERIALS FOR THE WESTROCK LONGVIEW GEN BANK PROJECT SHIPMENT NO. LNG-0001 . . . . . . . . . |