Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.21 | Average TEU per month: 0.62 |
Active Months: 4 | Average TEU per Shipment: 1.88 |
Shipment Frequency Std. Dev.: 0.42 |
Company Name | Shipments |
---|---|
GOLDSTAR STONES | 6 shipments |
EXPRESS STONE GROUP | 1 shipments |
GOLDSTAR 7419 BREN | 1 shipments |
HS Code | Shipments |
---|---|
490600 Plans and drawings; for architectural, engineering, industrial, commercial, topographical or similar, being originals drawn by hand; hand-written texts; photo- graphic reproductions; their carbon copies | 7 shipments |
681099 Cement, concrete or artificial stone; articles (other than prefabricated structural components for building or civil engineering), whether or not reinforced, n.e.c. in heading no. 6810 | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-08-18 | PPILDB00043814 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |
2024-06-03 | PPILDB00042908 | GOLDSTAR 7419 BREN | 21400.0 kg | 490600 | ENGINEERING STONE |
2023-11-03 | PPILCB00040455 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |
2023-10-30 | TXSLMSY2309118 | EXPRESS STONE GROUP | 42820.0 kg | 681099 | ARTIFICIAL STONE BASKET STRAINER STOVEPIPE IRON FRAME ARTIFICIAL STONE BASKET STRAINER STOVEPIPE IRON FRAME |
2023-09-13 | PPILCB00039605 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |
2023-06-07 | PPILCB00038736 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |
2023-04-15 | PPILCB00038160 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |
2022-11-26 | PPILCB00036801 | GOLDSTAR STONES | 21400.0 kg | 490600 | ENGINEERING STONE |