Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.19 | Average TEU per month: 0.38 |
Active Months: 3 | Average TEU per Shipment: 1.50 |
Shipment Frequency Std. Dev.: 0.40 |
Company Name | Shipments |
---|---|
COMPOSITE ESSENTIAL MATERIALS LLC | 5 shipments |
FRP DISTRIBUTION CO | 3 shipments |
HS Code | Shipments |
---|---|
844513 Textile machinery; drawing or roving machines for preparing textile fibres | 5 shipments |
701912 Glass fibres; (including glass wool), rovings | 2 shipments |
701911 Glass fibres; (including glass wool), chopped strands, of a length of not more than 50mm | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-07-15 | TXSLTJSE24060098 | FRP DISTRIBUTION CO | 21500.0 kg | 701912 | E-GLASS SPRAY UP ROVING 2400TEX (ORIGINAL CTG) TCR132BS-2400-12S AS PER P/I NO.JC3663, H.SCODE 7019120090. |
2024-05-29 | PPILS1CM057824 | FRP DISTRIBUTION CO | 20300.0 kg | 701911 | E-GLASS CHOPPED STRANDS FOR PP(ORIGINAL JUSHI) |
2024-01-20 | PPILSHMB9376 | FRP DISTRIBUTION CO | 21480.0 kg | 844513 | E-GLASS SPRAY UP ROVING 2400TEX (ORIGINAL CTG) |
2021-12-10 | PLKQSH21105270 | COMPOSITE ESSENTIAL MATERIALS LLC | 20160.0 kg | 844513 | ASSEMBLED ROVING |
2021-12-10 | NOVVNPT211000774 | COMPOSITE ESSENTIAL MATERIALS LLC | 40320.0 kg | 844513 | ASSEMBLED ROVING (E-GLASS SPRAY UP ROVING,ORIC2700-3B ASSEMBLED ROVING (E-GLASS SPRAY UP ROVING,ORIC2700-3B |
2021-10-31 | MLILMSHE21090367 | COMPOSITE ESSENTIAL MATERIALS LLC | 60480.0 kg | 844513 | ASSEMBLED ROVING ASSEMBLED ROVING ASSEMBLED ROVING |
2021-10-31 | MLILMSHE21090518 | COMPOSITE ESSENTIAL MATERIALS LLC | 41440.0 kg | 701912 | ASSEMBLED ROVING (E-GLASS SPRAY UP ROVING,ORIC2700-2,HS7019120090 ASSEMBLED ROVING (E-GLASS SPRAY UP ROVING,ORIC2700-2,HS7019120090 |
2021-08-18 | PSHYNBPIFOS91275 | COMPOSITE ESSENTIAL MATERIALS LLC | 41440.0 kg | 844513 | ASSEMBLED ROVING ASSEMBLED ROVING |