KALPATARU PROJECTS INTERNATIONAL LI
KALPATARU PROJECTS INTERNATIONAL LI's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.21 Average TEU per month: 0.46
Active Months: 3 Average TEU per Shipment: 1.83
Shipment Frequency Std. Dev.: 0.43
Shipments By Companies
Company Name Shipments
GOVERNMENT OF THE CO OPERATIVE REPU 1 shipments
KALPATARU PROJECTS INTERNATIONAL LI LOT 1 shipments
N V ENERGIE BEDRIJVEN EBS SURIN 1 shipments
Shipments By HS Code
HS Code Shipments
291439 Ketones; aromatic, (without other oxygen function), excluding phenylacetone (phenylpropan-2-one) 1 shipments
850423 Electrical transformers; liquid dielectric, having a power handling capacity exceeding 10,000kVA 1 shipments
870423 Vehicles; compression-ignition internal combustion piston engine (diesel or semi-diesel), for transport of goods, (of a g.v.w. exceeding 20 tonnes), n.e.c. in item no 8704.1 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2024-09-13 MAEU242612395 GOVERNMENT OF THE CO OPERATIVE REPU 9599.99 kg 850423 ENGINEERING, PROCUREMENT AND C ONSTRUCTION (EPC) SERVICES F OR TRANSMISSION LINES AND SUBS TATIONS FOR GUYANA INTEGRATED NGL PLANT AND 300MWE CCGT POWE R PLANT PROJECT CONTRACT NO : OPM/GTE/RFP/T-S/2022-1, 30 K V GROUNDING-EARTHING TRANSFORM ER HSN CODE : 85042310 SHIP PING BILL NUMBER: 2608060 DATE : 22-JUL-24 NET WT. : 9430 KG S GROSS WT. :9600 KGS
2024-07-26 MAEU239731428 N V ENERGIE BEDRIJVEN EBS SURIN 1548.59 kg 291439 1X20 CONTAINER 7 TOTAL PACKA GES (7 PACKAGES) ELECTRICIT Y SYSTEM UPGRADE AND EXPANSION PROJECT, CONTRACT CDB - 930 - 012, POWER PROJECT SURINAME - LOT 1 SUB STATIONS IN PARAM ARIBO & NICKERIE CCTV & HVAC INSTALLATIONS SB NO: 927101 2/20.04.2024 NOTIFY :-2 KA LPATARU PROJECTS INTERNATIONAL LIMITED STORES TOEVLUCHTWEG MICHILAAN STRAAT PARAMARIBO, SURINAME CONTACT PERSON:- VINA Y JAISWAL VINAY.JAISWAL@KALPA TARUPOWER.COM
2024-05-10 MAEU236782453 KALPATARU PROJECTS INTERNATIONAL LI LOT 20952.24 kg 870423 2 VEHICLES ENGINEERING, PROCU REMENT AND CONSTRUCTION (EPC ) SERVICES FOR TRANSMISSION LI NES AND SUBSTATIONS FOR GUYA NA INTEGRATED NGL PLANT AND 3 00MWE CCGT POWER PLANT PROJECT CONTRACT NO : OPM/GTE/RFP/T -S/2022-1 CHASSIS TATA ( TA TA, MODEL: SIGNA 2518.T, GVW-2 5T) CHASSIS NO : MAT448903P2R 33442, ENGINE NO : B591803232L 63938220 MANUFACTURING YEAR : 2023, MODEL : SIGNA 2518.T C HASSIS NO : MAT448903P2R33443, ENGINE NO : B591803432L6393856 2 MANUFACTURING YEAR : 2023, MODEL : SIGNA 2518.T TRUCK MO UNTED CRANE (PALFINGER KNUCKL E BOOM CRANE FULLY BUILD VEHIC LE) CRANE SERIAL NO : SP80200 1912, MANUFACTURING YEAR : 202 3 MODEL : PK32080 CRANE SERI AL NO : SP802001913, MANUFACTU RING YEAR : 2023 MODEL : PK32 080 SB NO: 7956604, 7956766 D T: 29.02.2024 HS CODE: 870423 00, 87042319 TOTAL NET WT: 20 952.00 KGS TOTAL GR WT: 2095 2.00 KGS 2 VEHICLES ENGINEERING, PROCU REMENT AND CONSTRUCTION (EPC ) SERVICES FOR TRANSMISSION LI NES AND SUBSTATIONS FOR GUYA NA INTEGRATED NGL PLANT AND 3 00MWE CCGT POWER PLANT PROJECT CONTRACT NO : OPM/GTE/RFP/T -S/2022-1 CHASSIS TATA ( TA TA, MODEL: SIGNA 2518.T, GVW-2 5T) CHASSIS NO : MAT448903P2R 33442, ENGINE NO : B591803232L 63938220 MANUFACTURING YEAR : 2023, MODEL : SIGNA 2518.T C HASSIS NO : MAT448903P2R33443, ENGINE NO : B591803432L6393856 2 MANUFACTURING YEAR : 2023, MODEL : SIGNA 2518.T TRUCK MO UNTED CRANE (PALFINGER KNUCKL E BOOM CRANE FULLY BUILD VEHIC LE) CRANE SERIAL NO : SP80200 1912, MANUFACTURING YEAR : 202 3 MODEL : PK32080 CRANE SERI AL NO : SP802001913, MANUFACTU RING YEAR : 2023 MODEL : PK32 080 SB NO: 7956604, 7956766 D T: 29.02.2024 HS CODE: 870423 00, 87042319 TOTAL NET WT: 20 952.00 KGS TOTAL GR WT: 2095 2.00 KGS
Contact information Request
to request contact information.
Other address
101 & 102B PART-III G I D C EST GUJARAT INDIA GST NO 24AAACK8387R1ZP
101 & 102B PART-III G I D C EST SECTOR-28 GANDHINAGAR-382 028 GUJARAT INDIA