Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
PEMEX TRANSFORMACION INDUSTRIAL | 1 shipments |
HS Code | Shipments |
---|---|
840211 Boilers; watertube boilers with a steam production exceeding 45t per hour | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-01-02 | CMDUEID0691583 | PEMEX TRANSFORMACION INDUSTRIAL | 57834.0 kg | 840211 | FLUE GAS STEAM GENERATOR PROJECT NUMBER: PTI-ID-S-004/2019 (PTD-ID), S(SECL) REQUICITION NO: 2B-206-1-1-H-RQ-0003 (PTI-ID)MBA229 (SECL) CONTRACT NO: PTI-ID-PROC-44-2020 TAG NO. SPE-21012 H.S. CODE: 8402.11 PART SHIPMENT FABRICATED SUPPORTS (INTEGRAL PIPING) FABRICATED SUPPORTS FOR STEAM PPG, DRAIN AND FABRICATED SUPPORT FOR NON-IBR PIPING STEAM BLOWING ARRANGEMENT WITH TARGET PLATE FABRICATED SUPPORTS FOR WATER PPG, DRAIN AND ELECTRICAL CABLE, CABLE GLAND, JB NON INTEGRAL WATER PIPING WITH HARDWARE NON INTEGRAL STEAM PIPING WITH HARDWARE NON-INTEGRAL DRAIN AND VENTS PIPING WITH HARDNON-IBR PIPING WITH HARDWARE RELIEF VALVE COMMISSIONING SPARES FOR PRESSURE PARTS INSTRU CABLE TRAY,ACCESS SUPPORT(FOR SHOP A UNITISATION - RC PUMP WITH MOTOR UNITISATION - RC PUMP WITH MOTOR SPARES INSULATION AND CLADG FOR BOILER (FOR SHOP ASSS/BILL NOS.4009338 DT.29.11.22 FREIGHT PREPAID OVERSIZE - HEIGHT: 65.2 CM FREIGHT PREPAID FLUE GAS STEAM GENERATOR PROJECT NUMBER: PTI-ID-S-004/2019 (PTD-ID), S(SECL) REQUICITION NO: 2B-206-1-1-H-RQ-0003 (PTI-ID)MBA229 (SECL) CONTRACT NO: PTI-ID-PROC-44-2020 TAG NO. SPE-21012 H.S. CODE: 8402.11 PART SHIPMENT FABRICATED SUPPORTS (INTEGRAL PIPING) FABRICATED SUPPORTS FOR STEAM PPG, DRAIN AND FABRICATED SUPPORT FOR NON-IBR PIPING STEAM BLOWING ARRANGEMENT WITH TARGET PLATE FABRICATED SUPPORTS FOR WATER PPG, DRAIN AND ELECTRICAL CABLE, CABLE GLAND, JB NON INTEGRAL WATER PIPING WITH HARDWARE NON INTEGRAL STEAM PIPING WITH HARDWARE NON-INTEGRAL DRAIN AND VENTS PIPING WITH HARDNON-IBR PIPING WITH HARDWARE RELIEF VALVE COMMISSIONING SPARES FOR PRESSURE PARTS INSTRU CABLE TRAY,ACCESS SUPPORT(FOR SHOP A UNITISATION - RC PUMP WITH MOTOR UNITISATION - RC PUMP WITH MOTOR SPARES INSULATION AND CLADG FOR BOILER (FOR SHOP ASSS/BILL NOS.4009338 DT.29.11.22 FREIGHT PREPAID OVERSIZE - HEIGHT: 65.2 CM FLUE GAS STEAM GENERATOR PROJECT NUMBER: PTI-ID-S-004/2019 (PTD-ID), S(SECL) REQUICITION NO: 2B-206-1-1-H-RQ-0003 (PTI-ID)MBA229 (SECL) CONTRACT NO: PTI-ID-PROC-44-2020 TAG NO. SPE-21012 H.S. CODE: 8402.11 PART SHIPMENT FABRICATED SUPPORTS (INTEGRAL PIPING) FABRICATED SUPPORTS FOR STEAM PPG, DRAIN AND FABRICATED SUPPORT FOR NON-IBR PIPING STEAM BLOWING ARRANGEMENT WITH TARGET PLATE FABRICATED SUPPORTS FOR WATER PPG, DRAIN AND ELECTRICAL CABLE, CABLE GLAND, JB NON INTEGRAL WATER PIPING WITH HARDWARE NON INTEGRAL STEAM PIPING WITH HARDWARE NON-INTEGRAL DRAIN AND VENTS PIPING WITH HARDNON-IBR PIPING WITH HARDWARE RELIEF VALVE COMMISSIONING SPARES FOR PRESSURE PARTS INSTRU CABLE TRAY,ACCESS SUPPORT(FOR SHOP A UNITISATION - RC PUMP WITH MOTOR UNITISATION - RC PUMP WITH MOTOR SPARES INSULATION AND CLADG FOR BOILER (FOR SHOP ASSS/BILL NOS.4009338 DT.29.11.22 FREIGHT PREPAID OVERSIZE - HEIGHT: 65.2 CM |