Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
RIMEX INC | 7 shipments |
GROVE U S L L C | 2 shipments |
HOFFMAN EQUIPMENT | 1 shipments |
OTR WHEEL ENGINEERING CANADA | 1 shipments |
QUALITY EQUIPMENT INC | 1 shipments |
TK AIRPORT SOLUTIONS INC | 1 shipments |
TK AIRPORT SOLUTIONS S A | 1 shipments |
TK_AIRPORT SOLUTIONS INC | 1 shipments |
HS Code | Shipments |
---|---|
843110 Machinery; parts of the machinery of heading no. 8425 | 7 shipments |
400610 Rubber; unvulcanised, camel-back strips for retreading rubber tyres | 2 shipments |
871492 Cycles; parts thereof, wheel rims and spokes | 2 shipments |
401193 New pneumatic tyres, of rubber | 1 shipments |
401290 Rubber; tyres n.e.c. in heading no. 4012 | 1 shipments |
846930 | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-10-08 | MCPVCGLS50026132 | TK AIRPORT SOLUTIONS INC | 18026.0 kg | 400610 | SOLID INDUSTRIAL TYRES & POB TYRES |
2023-07-21 | DSVFDSV0355882 | QUALITY EQUIPMENT INC | 864.0 kg | 871492 | CONSTRUCTION WHEEL ASSEMBLE |
2023-06-05 | MCPVCGLS50025531 | TK AIRPORT SOLUTIONS S A | 6332.0 kg | 400610 | SOLID INDUSTRIAL TYRES & POB TYRES |
2023-05-19 | DSVFDSV0355864 | HOFFMAN EQUIPMENT | 1494.0 kg | 846930 | 02 PACKAGES (12 PIECES) |
2023-05-19 | DSVFDSV0355867 | GROVE U S L L C | 747.0 kg | 871492 | CONSTRUCTION WHEEL ASSEMBLE |
2023-05-19 | DSVFDSV0355865 | GROVE U S L L C | 747.0 kg | 01 PACKAGES (06 PIECES) | |
2023-04-20 | MCPVCGLS50025086 | TK_AIRPORT SOLUTIONS INC | 11626.0 kg | 401290 | TIRE, SOLID AND WHEEL |
2022-07-28 | HLCUCM2MF10460AA | RIMEX INC | 20874.0 kg | 843110 | CONSTRUCTION RIM BASE ASSEMBLE 96 PIECES (33 PACKAGES) CONTAINING 24 PIECES (12 PACKAGES) CONSTRUCTION RIM BASE ASSEMBLE - UNPAINTED 12 PIECES (01 PACKAGE) CONSTRUCTION SIDE FLANGE 60 PIECES (20 PACKAGES) CONSTRUCTION RIM ASSEMBLE - UNPAINTED H.S.CODE 8431.1000 NET WEIGHT 19469.04 KGS |
2022-07-28 | HLCUCM2MF10460AB | RIMEX INC | 21148.0 kg | 843110 | CONSTRUCTION RIM BASE ASSEMBLE 200 PIECES (29 PACKAGES) CONTAINING 24 PIECES (04 PACKAGES) CONSTRUCTION WHEEL ASSEMBLE -PAINTED [470 -YELLOW] 100 PIECES (01 PACKAGE) LOCK RING ONLY 36 PIECES (12 PACKAGES) CONSTRUCTION RIM ASSEMBLE - UNPAINTED 24 PIECES (04 PACKAGES) CONSTRUCTION WHEEL ASSEMBLE 16 PIECES (08 PACKAGES) CONSTRUCTION RIM ASSEMBLY-UNPAINTED H.S.CODE 8431.1000 NET WEIGHT 19943.12 KGS |
2022-04-21 | CMDUCBO0247438 | RIMEX INC | 16312.0 kg | 843110 | ------------ TGHU9594050 DESCRIPTION---------01 X 40HC CONTAINER 96 PIECES (28 PACKAGES) CONTAINING 24 PIECES (12 PACKAGES) CONSTRUCTION RIM BASE ASSEMBLE - UNPAINTED 24 PIECES (12 PACKAGES) 5PC BLNK RIM ASSY 24 PIECES (02 PACKAGES) SIDE FLANGE 24 PIECES (02 PACKAGES) CONSTRUCTION SIDE FLANGE H.S.CODE : 8431.1000 NET WEIGHT: 15,060.00 KGS FREIGHT PREPAID -------------GENERIC DESCRIPTION------------- |
2021-05-06 | CMDUCBO0217209 | RIMEX INC | 17462.0 kg | 843110 | ------------ TEMU7447336 DESCRIPTION---------01 X 40 HC CONTAINER 82 PIECES (32 PACKAGES) CONTAINING 48 PIECES (20 PACKAGES) CONSTRUCTION RIM ASSEMBLY 34 PIECES (12 PACKAGES) CONSTRUCTION RIM ASSEMBLE H.S.CODE : 8431.1000 PACKING LIST NO: PL 02609 INVOICE NO: B-21319 PO NO: V00003797 PERPAID -------------GENERIC DESCRIPTION------------- |
2021-04-11 | MEDUC0533579 | OTR WHEEL ENGINEERING CANADA | 7321.0 kg | 401193 | CONSTRUCTION DROP CENTER RIM BASE,CONSTRUCTION TUB - 24 PACKAGES CONTAINING 24 PIECES 12 PACKAGES CONSTRU CTION DROP CENTER RIM BASE WITH ONE STIFNER - UNPAIN TED 16 PIECES 08 PACKAGES CONSTRUCTION DROP CENTER R IM BASE - UNPAINTED 08 PIE CES 04 PACKAGES CONSTRUCTI ON TUBELESS RIM UNPAINED H S CODE: 8431.10.00 NET WEI GHT: 6,241.120 KGS |
2021-04-05 | CMDUCBO0215005 | RIMEX INC | 16760.0 kg | 843110 | ------------ CMAU4218757 DESCRIPTION---------01 X 40 HC CONTAINER 234 PIECES (32 PACKAGES) CONTAINING 04 PIECES (02 PACKAGES) CONSTRUCTION RIM BASS ASSEMBLE 56 PIECES (24 PACKAGES) CONSTRUCTION RIM ASSE24 PIECES (04 PACKAGES) CONSTRUCTION WHEEL ASSEMBLY 150 PIECES (02 PACKAGES) CONSTRUCTION LOCK RIH.S.CODE : 8431.1000 FREIGHT PREPAID FCL/FCL -------------GENERIC DESCRIPTION------------- |
2021-01-30 | EGLV130000073162 | RIMEX INC | 17124.0 kg | 843110 | CONSTRUCTION RIM ASSEMBLE 01 X 40 HC CONTAINER 86 PIECES (34 PACKAGES) CONTAINING 50 PIECES (22 PACKAGES) 5P CONSTRUCTION RIM ASSEMBLY 36 PIECES (12 PACKAGES) 3P CONSTRUCTION RIM ASSEMBLY H.S.CODE 8431.1000 NET WEIGHT 15,669.9 KGS @[email protected] |
2021-01-30 | CMDUCBO0209699 | RIMEX INC | 13365.0 kg | 843110 | ------------ APZU4579939 DESCRIPTION---------01 X 40 GP CONTAINER 160 PIECES (40 PACKAGES) CONTAINING 20 PIECES (10 PACKAGES) 5P-RIM ASSEMBLY 24 PIECES (08 PACKAGES) CONSTRUCTION RIM ASSEMBLE 16 PIECES (08 PACKAGES) 5P CONSTRUCTION RIM ASSEMBLY 100 PIECES (14 PACKAGES) CONSTRUCTION BEAD SEAT H.S.CODE : 8431.1000 FREIGHT PREPAID FCL/FCL -------------GENERIC DESCRIPTION------------- |