Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
BADGER EQUIPMENT COMPANY | 5 shipments |
MANITEX INC | 4 shipments |
SOLUCIONES INDUSTRIALES Y EQUIPOS | 1 shipments |
HS Code | Shipments |
---|---|
050290 Animal products; badger hair and other brush making hair and waste of such bristles or hair, n.e.c. in heading no. 0502 (excluding horsehair) | 3 shipments |
252230 Hydraulic lime; excluding calcium oxide and hydroxide of heading no. 2825 | 1 shipments |
262060 Slag, ash and residues; (not from the manufacture of iron or steel), containing arsenic, mercury, thallium or their mixtures, of a kind used for the extraction of arsenic or those metals or for the manufacture of their chemical compounds | 1 shipments |
290513 Alcohols; saturated monohydric, butan-1-ol (n-butyl alcohol) | 1 shipments |
701919 Glass fibres; (including glass wool), slivers, yarns and threads | 1 shipments |
842620 Cranes; tower cranes | 1 shipments |
900620 Cameras, photographic (excluding cinematographic); photographic flashlight apparatus and flashbulbs other than discharge lamps of heading no. 8539 | 1 shipments |
981800 | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2021-12-10 | SUDU71999AI1K002 | SOLUCIONES INDUSTRIALES Y EQUIPOS | 15940.0 kg | 252230 | HYDRAULIC CRANE |
2021-06-19 | MEDULD909189 | BADGER EQUIPMENT COMPANY | 9940.0 kg | 900620 | NR. 04 KIT SCORPION 62 AND NR. 01 PALLET OF ACCESSORIES WITH DOCUMENTS |
2021-06-19 | MEDULD945092 | BADGER EQUIPMENT COMPANY | 10185.0 kg | 981800 | NR. 04 KIT SCORPION 62 AND NR. 01 PALLET OF ACCESSORIES WITH DOCUMENTS AND 01 CARTON OF SPARE PARTS |
2021-06-11 | MEDULD718499 | BADGER EQUIPMENT COMPANY | 9940.0 kg | 050290 | NR. 04 KIT SCORPION 62 AND NR. 01 PALLET OF ACCESSORIES WITH DOCUMENTS PM INVOICES 200424-200425-200594-20059 5 BADGER PO NO. 233689 |
2021-06-06 | MEDULD686886 | MANITEX INC | 4005.0 kg | 290513 | 03 UNITS OF PM HYDRAULIC CRANES COMPLETE WITHACCESSORIE AND DOCUMENTS PM OIL & STEEL INVO ICES N.200677-200678-200679 MANITEX PO. N. 724146/ FREIGHT PREPAID |
2021-05-20 | MEDULD670385 | MANITEX INC | 18000.0 kg | 701919 | NO 11 CABSMANITEX PO 722790/722789 INVOICE NR. 200592/200591/200590/20058 9/200588/ DATED 16/04/2021 |
2021-05-06 | MEDULD466669 | BADGER EQUIPMENT COMPANY | 9960.0 kg | 050290 | NR. 04 KIT SCORPION 62 AND NR. 01 PALLET OF ACCESSORIES WITH DOCUMENTS PM INVOICES 200357-200358-200359-20036 0 BADGER PO NO. 233688 |
2021-04-28 | MEDULD322896 | MANITEX INC | 3005.0 kg | 262060 | 01 UNIT OF PM HYDRAULIC CRANES COMPLETE WITH ACCESSORIES, DOCUMENTS AND ACCESSORIES PO NUMBER 720944 PM INVOICES N. 200384 FREIGHT PREPAID =WPATTERSON=VALEXANDER.COM TSCHIERHOLZ=VALEXANDER. COM |
2021-04-27 | MEDULD375761 | BADGER EQUIPMENT COMPANY | 9960.0 kg | 050290 | NR. 04 KIT SCORPION 62 AND NR. 01 PALLET OF ACCESSORIES WITH DOCUMENTS PM INVOICES 200245/200246/200247/20024 8 BADGER PO NR. 23368 FREIGHT PREPAID |
2021-02-05 | MEDULA806909 | MANITEX INC | 1450.0 kg | 842620 | 01 UNIT OF PM HYDRAULIC CRANES COMPLETE WITH ACCSSORIES AND DOCUMENTS PM OIL AND STEEL INVOICE NO. 201687 |
VIA G VERDI 22 41018 - MODENA - ITALY |
---|