Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.33 | Average TEU per month: 0.54 |
Active Months: 5 | Average TEU per Shipment: 1.30 |
Shipment Frequency Std. Dev.: 0.49 |
Company Name | Shipments |
---|---|
TRUE NORTH RAILINGS INC | 2 shipments |
2290568 AB LTD | 1 shipments |
AIR COVER SQUAD | 1 shipments |
KRAFT FENCING | 1 shipments |
M J DECOR AND RAILINGS LTD | 1 shipments |
HS Code | Shipments |
---|---|
281830 Aluminium hydroxide | 4 shipments |
392220 Plastics; lavatory seats and covers | 1 shipments |
871493 Cycles; parts thereof, hubs (other than coaster braking hubs and hub brakes) and free-wheel sprocket-wheels | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-10-14 | SHPT95109435 | AIR COVER SQUAD | 1510.0 kg | 392220 | ALUMINUM AC COVER |
2024-09-20 | CAVTCSSE240674 | 2290568 AB LTD | 14600.0 kg | 281830 | ALUMINUM RAILING |
2024-07-13 | UULNQD24060628 | TRUE NORTH RAILINGS INC | 9000.0 kg | 281830 | ALUMINUM RAILING THISSHIPMENTCONTAINSNOSO . |
2024-06-14 | ECUWTAOVAN05524 | M J DECOR AND RAILINGS LTD | 9560.0 kg | 871493 | ALUMINIUM HANDRAILING |
2024-03-13 | SHPT29908089 | KRAFT FENCING | 80.0 kg | 281830 | ALUMINUM GATE |
2022-06-05 | PRIM2GG05758 | TRUE NORTH RAILINGS INC | 8120.0 kg | 281830 | ALUMINUM RAILING |