SKIPPER LIMITED
SKIPPER LIMITED's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.38 Average TEU per month: 3.96
Active Months: 3 Average TEU per Shipment: 7.92
Shipment Frequency Std. Dev.: 0.89
Shipments By Companies
Company Name Shipments
6610 55 6 shipments
ELECNOR CHILE S A 4 shipments
AGRUPACION SABANITAS PANAMA 2 shipments
BANDTEL S A 2 shipments
GRUPO ENERGIA BOGOTA SA ESP NIT 899 999 082 3 Y/O DEPOSITO / UC S A 2 shipments
ADMINSTRACION NACIONAL DE ELECTRI 1 shipments
CIE SA 1 shipments
CITY OF BENTONVILLE 1 shipments
CITY OF SANTA CLARA PURCHASING CITY HALL 1 shipments
CORLISS PARK STATION 1 shipments
DEPARTMENT OF WATER AND POWER 1 shipments
GRUPO ENERGIA BOGOTA SA ESP NIT 1 shipments
IPA INTERMOUNTAIN POWER AGENCY 1 shipments
IPA INTERMOUNTAINS POWER AGENCY 1 shipments
IPA INTERMOUTAIN POWER AGENCY 1 shipments
RED DE ENERGIA DEL PER USA 1 shipments
TRINIDAD AND TOBAGO ELECTRICITY COM LP 1 shipments
VOLTAGE POWER LTD 1 shipments
Shipments By HS Code
HS Code Shipments
730820 Iron or steel; structures and parts thereof, towers and lattice masts 13 shipments
730890 Iron or steel; structures and parts thereof, n.e.c. in heading 7308 3 shipments
871420 Carriages for disabled persons; parts and accessories thereof 3 shipments
731700 Iron or steel; nails, tacks, drawing pins, corrugated nails, staples (not those of heading no. 8305) and the like, with heads of other material or not, but excluding articles with heads of copper 2 shipments
950611 Skis; for snow 2 shipments
722990 Steel, alloy; wire, of materials other than silico-manganese steel 1 shipments
730800 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 1 shipments
730832 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 1 shipments
841829 Refrigerators; household, electric or not, other than compression-type 1 shipments
842620 Cranes; tower cranes 1 shipments
940430 Sleeping bags 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2024-10-12 SJLVKOL4759TRO CORLISS PARK STATION 2970.0 kg 730890 GALVANIZED LIGHTING MAST STRUCTURE , COUNTRY OF ORIGIN - INDIA , HS CODE NO. 7308.90.70
2024-06-17 MOSJ19834000188 ADMINSTRACION NACIONAL DE ELECTRI 51212.0 kg 730820 HS CODE 7308 2011 TORRES METALICAS COMPLETA SSORIES . HS CODE 7308 2011 TORRES METALICAS COMPLETA SSORIES .
2024-06-14 PGAMVFLKOL240015 VOLTAGE POWER LTD 45780.0 kg 731700 GALVANIZED STEEL MONOPOLES GALVANIZED STEEL MONOPOLES GALVANIZED STEEL MONOPOLES GALVANIZED STEEL MONOPOLES GALVANIZED STEEL MONOPOLES GALVANIZED STEEL MONOPOLES
2024-04-16 MEDUE7622222 RED DE ENERGIA DEL PER USA 116950.0 kg 730820 GALVANIZED TRANSMISSION LINE TOWERS & ACCESSORIES - 4 X 20 & 1 X 40 HC TOTAL 277 PACKAGE S GALVANIZED TRANSMISSION LINE TOWERS & ACC ESSORIES ACQUISITIO N OF METALLIC STRUCTURE S 9 15 GM2, TYPE TOWER B, BO DIES 2, 3 AND 6 FOR 220KV TRANSMISSION LINES CFR P UERTO CALLAO, INCOTERMS 20 20 ACQUISITION OF META L STRUCTURES 915 GM2, TYPE TOWER B, BODIES 2, 3 AND 6 FOR 220KV TRANSMISSION LINES P ROJECT FOR EXTEN SION 21 REP-GP CONTRACT- 4 200000940-2023 HS CODE : 7308.20.11 SHIPP ING BI LL NO: 7777121 DATE: 23-02 -2024, 78 06636 DATE: 24- 02-2024, 7854775 DATE: 26 -0 2-2024 7886867 DATE: 2 7-02-2024, 7905740 D ATE: 2 8-02-2024 TOTAL NET WEIG HT: 115.213 MT TOTAL GRO SS WEIGHT: 116.950 MT TO TA L PACKAGES: 277 = (ESQ UINA DE JUAN DE ARON A WITH CAMELIAS) LIMA - LIMA - SAN ISIDRO TELEPHONE: + 64 4 590 7440 INCOTERM MEN TION ED STRICTLY WITHOUT PR EJUDICE TO THE TERMS &CON DITIONS OF THE CONTRACT OF CARRIAGE. GALVANIZED TRANSMISSION LINE TOWERS & ACCESSORIES - GALVANIZED TRANSMISSION LI NE TOWERS &ACCESSORIES GALVANIZED TRANSMISSION LINE TOWERS & ACCESSORIES - GALVANIZED TRANSMISSION LI NE TOWERS &ACCESSORIES GALVANIZED TRANSMISSION LINE TOWERS & ACCESSORIES - GALVANIZED TRANSMISSION LI NE TOWERS &ACCESSORIES GALVANIZED TRANSMISSION LINE TOWERS & ACCESSORIES - GALVANIZED TRANSMISSION LI NE TOWERS &ACCESSORIES
2024-04-16 MEDUE7662384 ELECNOR CHILE S A 289650.0 kg 730820 STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT CIF C ORONEL, CHILE IEC NO 0294006109 HS CODE NO. 7308.20.11 TOTAL NET WT:28 7.230 MT GROSS WT :289.650 MT TOTAL NO OF PACKAGES:55 2 PACKAGES SHIPPING BILL N O.7746073 DATE: 22-FEB-24 S HIPPING BILL NO.7746096 D ATE: 22-FEB-24 SHIPPING BI LL NO.7756067 DATE: 23-FEB -24 SHIPPING BILL NO.77815 28 DATE: 23-FEB-24 SHIPPIN GBILL NO.7781692 DATE: 23 -FEB-24 SHIPPING BI LL NO.7 781865 DATE: 26-FEB-24 SHI PPING BILLNO.7838334 DATE : 26-FEB-24 SHIPPING BILL NO .7838296 DATE: 26-FEB-24 SHIPPING BILL NO.7838357 DATE: 26-FEB-24 SHIPPING B ILL NO.786615 6 DATE: 27-FE B-24 SHIPPING BILL NO.7897 127 DATE: 28-FEB-24 SHIPPI NG BILL NO.7945677 DATE: 2 9-02-2024 SHIPPING BILL NO .7945803 DATE:29-02-2024 F REIGHT PREPAID INCOTERM M ENTI ONED STRICTLY WITHOUT PREJUDICE TO THE TERMS & CONDITIONS OF THE CONTRACT OF CARRIAGE STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT STEEL TOWERS FOR TRANSMISSION LINE - STEEL TOWERS AND STRUCTURE S INTENDED FOR THE CONSTRUCTION OF THE TRANSMISSION LINE PROJECT
2024-04-04 MEDUE7411022 CIE SA 48800.0 kg 730820 PARTS OF TOWERS FOR ELECTRICAL TRANSMISSION LINES - PARTS OF TOWERS FOR ELECTR ICAL TRANSMISSION LINES PARTS OF TOWERS FOR ELECTRICAL TRANSMISSION LINES - TOTAL 87 PACKAGES PARTS OF TOWERS FO R ELECTRICAL T RANSMISSION LINES SHIPPING TERMS: CIP ASUNCION, PARA GUAY INCOTERMS 2010 S/BI LL : 7411678 & 7411726 DTD : 09-02-202 4 HS CODE N O. 7308.20.11 TOTAL NET WT. 47. 881 MT TOTAL GROS S WT. 48.800 MT FREIGHT PREPAID = RUC: 80030503- 5
2023-11-21 HDMUCCUM920291A1 CITY OF BENTONVILLE 7764.0 kg 950611 STEEL POLES FOR BEUD
2023-11-20 SWLVSWLKOL001100 DEPARTMENT OF WATER AND POWER 33080.0 kg 841829 MONOPOLE 223P1 TYPE MONOPOLE 223P1 TYPE MONOPOLE 223P1 TYPE MONOPOLE 223P1 TYPE MONOPOLE 223P1 TYPE
2023-10-28 MAEU230220714 GRUPO ENERGIA BOGOTA SA ESP NIT 899 999 082 3 Y/O DEPOSITO / UC S A 84995.11 kg 730832 4X20 FCL CONTAINERS FCL STC TOTAL 190 PACKAGES GALVANISE D TRANSMISSION LINE TOWER MAN UFACTURE, FACTORY TESTS AND SU PPLY OF METALLIC STRUCTURE FOR GRUPO ENERGIA BOGOTA PROJECTS (PCA-RQ-GIN-22-1315) NET WEI GHT : 83.178M.T. HS CODE : 73 08 SBILL NO. 3226242 DT. 16.0 8.2023,3297292 ,3297366 DT.18. 08.2023,3355993 DT. 21.08.2023 4X20 FCL CONTAINERS FCL STC TOTAL 190 PACKAGES GALVANISE D TRANSMISSION LINE TOWER MAN UFACTURE, FACTORY TESTS AND SU PPLY OF METALLIC STRUCTURE FOR GRUPO ENERGIA BOGOTA PROJECTS (PCA-RQ-GIN-22-1315) NET WEI GHT : 83.178M.T. HS CODE : 73 08 SBILL NO. 3226242 DT. 16.0 8.2023,3297292 ,3297366 DT.18. 08.2023,3355993 DT. 21.08.2023 4X20 FCL CONTAINERS FCL STC TOTAL 190 PACKAGES GALVANISE D TRANSMISSION LINE TOWER MAN UFACTURE, FACTORY TESTS AND SU PPLY OF METALLIC STRUCTURE FOR GRUPO ENERGIA BOGOTA PROJECTS (PCA-RQ-GIN-22-1315) NET WEI GHT : 83.178M.T. HS CODE : 73 08 SBILL NO. 3226242 DT. 16.0 8.2023,3297292 ,3297366 DT.18. 08.2023,3355993 DT. 21.08.2023 4X20 FCL CONTAINERS FCL STC TOTAL 190 PACKAGES GALVANISE D TRANSMISSION LINE TOWER MAN UFACTURE, FACTORY TESTS AND SU PPLY OF METALLIC STRUCTURE FOR GRUPO ENERGIA BOGOTA PROJECTS (PCA-RQ-GIN-22-1315) NET WEI GHT : 83.178M.T. HS CODE : 73 08 SBILL NO. 3226242 DT. 16.0 8.2023,3297292 ,3297366 DT.18. 08.2023,3355993 DT. 21.08.2023
2023-10-07 MAEU230186833 GRUPO ENERGIA BOGOTA SA ESP NIT 899 999 082 3 Y/O DEPOSITO / UC S A 47000.67 kg 722990 2X20 FCL CONTAINERS FCL STC TOTAL 77 PACKAGES TOWER H IGH TENSILE STEEL & MILD STEEL GALVANISED TRANSMISSION LINE TOWER (Z). BUYER PO NO: 451 001767 (PO-3) DT. 15/12/2022. S.BILL NO. 3172903 DTD. 13. 08.2023, 3226105 DT. 16.08.202 3. 2X20 FCL CONTAINERS FCL STC TOTAL 77 PACKAGES TOWER H IGH TENSILE STEEL & MILD STEEL GALVANISED TRANSMISSION LINE TOWER (Z). BUYER PO NO: 451 001767 (PO-3) DT. 15/12/2022. S.BILL NO. 3172903 DTD. 13. 08.2023, 3226105 DT. 16.08.202 3.
2023-08-01 MEDUIU875205 ELECNOR CHILE S A 671590.0 kg 730820 STEEL TOWERS AND STRUCTURES - 40 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 35 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 74 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 28 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 36 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 21 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 36 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 25 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 82 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 24 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 22 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 48 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 29 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 33 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 31 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 22 PACKAGES ST EEL TOWERS AND STRUCTURES STEEL TOWERS AND STRUCTURES - 42 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 64 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 76 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 22 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 29 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 32 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 21 X 20 AND 7 X 40 TOTA L 1165 PACKAGES STEEL TO WERS A ND STRUCTURES INTE NDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT UNDER PO NO. 90 .019.308, 309 & 322. HS CODE: 7308. 20.11 SHIPPIN G BILL NO: 9857384 DT : 08 .0 5.2023 9857378 DT : 08.05.2023 9857380 DT : 08/05/2023 9857377 DT : 08.05.2023 9 857374 DT : 08.05.2023 985736 9 DT: 08.05 .2023 9857 383 DT : 08/05/2023 985 8092 DT : 08.05.2023 9858100 DT : 08.05.2023 9858093 DT : 08.05.2023 9857366 DT : 08.0 5.202 3 9857379 DT : 08.05 .2023 98924 19 DT: 09.05 .2023 9892426 DT : 09 .05.20 23 9892429 DT : 0 9.05.2023 9892444 DT : 09.05.2023 9919538 DT : 10.05.2023 9948 276 DT : 11.05.2023 994828 0 DT: 11.05.202 3 99759 93 DT: 12.05.2023 99759 94 DT: 12 .05.2023 99760 12 DT: 12.05.2023 10288 88 DT: 15.05.2023 10288 83 DT: 15.05.2023 1 0288 72 DT: 15.05.2023 10379 95 DT: 15.05.2 023 10288 90 DT: 15.05.2023 10288 84 DT: 15.05.2023 TOTAL GROSS WEIGHT: 671.590 MT T OTAL NET WEIGHT: 668.299 MT FREIGHT PREPAID . = CONTACT: GINO MUNOZ OR PE DRO MIRA STEEL TOWERS AND STRUCTURES - 108 PACKAGES STEEL TOWERS AND STRUCTURES STEEL TOWERS AND STRUCTURES - 55 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 27 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 25 PACKAGES STEEL TOWERS A ND STRUCTURES STEEL TOWERS AND STRUCTURES - 70 PACKAGES STEEL TOWERS A ND STRUCTURES
2023-07-28 MAEU228008847 GRUPO ENERGIA BOGOTA SA ESP NIT 17400.1 kg 730800 GALVANISED TRANSMISSION LINE T OWER MANUFACTURE, FACTORY TES TS AND SUPPLY OF METALLIC STRU CTURE FOR GRUPO ENERGIA BOGOTA PROJECTS (PCA-RQ-GIN-22-1315) SB NO.: 1632745 DATE.:09/06/ 2023 HS CODE.: 7308 TOTAL NE T WT.: 16.629 MT TOTAL GROSS WT.: 17.400 GRUPO ENERGIA BOG OTA S.A ESP NIT 899.999.082-3 FREIGHT PREPAID
2023-07-01 MAEU226605256 AGRUPACION SABANITAS PANAMA 71270.99 kg 730820 LATTICE STEEL TOWERS INTENDED FOR THE DEVELOPMENT OF THE PRO JECT SUMINI STRO, MONTAJE, OBRAS CIVILES Y PUESTA EN OP ERACION PARA LA CONSTRUCCION D E LA LINEA DE TRANSMISION : DE 230 KV SABANITAS- PANAMA II I Y SUBESTACIONES ASOCIADAS ACCORDING TO CONTRACT 034/000 1-001-2021 OF THE 29TH OF NOVE MB ER OF 2021. DELIVERY TERM S: CIF MANZANILLO IN PANAMA BOOKING NO : 226605281 TRHU1 139936, S.B - 9209021, DT-11.0 4.2023 MSKU5529163, S.B - 920 9019, DT-11.04.2023 MSKU40588 34, S.B - 9209020, DT-11.04.20 23 MRSU0040057, S.B - 9215142 , DT-11.04.2023 MRKU9759650, S.B - 9215143, DT-11.04.2023 MRKU6785147, S.B - 9238956, DT -12.04.2023 SUDU1392517, S.B - 9276176, DT-13.04.2023 MRKU 9214347, S.B - 9246154, DT-12. 04.2023 MRKU8707903, S.B - 92 76156, DT-13.04.2023 MSKU3381 858, S.B - 9351049, DT-17.04.2 023 MRKU7495538, S.B - 935105 7, DT-17.04.2023 MSKU3724221, S.B - 9351054, DT-17.04.2023 MAEU6962117, S.B - 9399401, D T-19.04.2023 MSKU2433160, S.B - 9458101, DT-21.04.2023 MSK U2446506, S.B - 9463086, DT-21 .04.2023 MSKU2803075, S,B - 9 504288, DT-24.04.2023 PONU035 4165, S.B - 9567766, DT-26.04. 2023 MSKU2276924, S.B - 97046 06, DT-02.05.2023 BOOKIN G NO : 226605256 MRKU0918730, S.B - 9238946, DT-12.04.2023 MRKU0717736, S.B - 9249973, D T-12.04.2023 MRKU0581249, S.B - 9424222, DT-20.04.2023 PON U1686987, S.B - 9585817, DT-27 .04.2023 HS CODE: 7308.20.1 1 LC NO. 5494BTY292300 , DT. 22/03/2022. TOTAL NET WEIGHT : 488.007 MT TOTAL GROSS WEIG HT: 495.761 MT TOTAL PACKAGES : 1146 LATTICE STEEL TOWERS INTENDED FOR THE DEVELOPMENT OF THE PRO JECT SUMINI STRO, MONTAJE, OBRAS CIVILES Y PUESTA EN OP ERACION PARA LA CONSTRUCCION D E LA LINEA DE TRANSMISION : DE 230 KV SABANITAS- PANAMA II I Y SUBESTACIONES ASOCIADAS ACCORDING TO CONTRACT 034/000 1-001-2021 OF THE 29TH OF NOVE MB ER OF 2021. DELIVERY TERM S: CIF MANZANILLO IN PANAMA BOOKING NO : 226605281 TRHU1 139936, S.B - 9209021, DT-11.0 4.2023 MSKU5529163, S.B - 920 9019, DT-11.04.2023 MSKU40588 34, S.B - 9209020, DT-11.04.20 23 MRSU0040057, S.B - 9215142 , DT-11.04.2023 MRKU9759650, S.B - 9215143, DT-11.04.2023 MRKU6785147, S.B - 9238956, DT -12.04.2023 SUDU1392517, S.B - 9276176, DT-13.04.2023 MRKU 9214347, S.B - 9246154, DT-12. 04.2023 MRKU8707903, S.B - 92 76156, DT-13.04.2023 MSKU3381 858, S.B - 9351049, DT-17.04.2 023 MRKU7495538, S.B - 935105 7, DT-17.04.2023 MSKU3724221, S.B - 9351054, DT-17.04.2023 MAEU6962117, S.B - 9399401, D T-19.04.2023 MSKU2433160, S.B - 9458101, DT-21.04.2023 MSK U2446506, S.B - 9463086, DT-21 .04.2023 MSKU2803075, S,B - 9 504288, DT-24.04.2023 PONU035 4165, S.B - 9567766, DT-26.04. 2023 MSKU2276924, S.B - 97046 06, DT-02.05.2023 BOOKIN G NO : 226605256 MRKU0918730, S.B - 9238946, DT-12.04.2023 MRKU0717736, S.B - 9249973, D T-12.04.2023 MRKU0581249, S.B - 9424222, DT-20.04.2023 PON U1686987, S.B - 9585817, DT-27 .04.2023 HS CODE: 7308.20.1 1 LC NO. 5494BTY292300 , DT. 22/03/2022. TOTAL NET WEIGHT : 488.007 MT TOTAL GROSS WEIG HT: 495.761 MT TOTAL PACKAGES : 1146 LATTICE STEEL TOWERS INTENDED FOR THE DEVELOPMENT OF THE PRO JECT SUMINI STRO, MONTAJE, OBRAS CIVILES Y PUESTA EN OP ERACION PARA LA CONSTRUCCION D E LA LINEA DE TRANSMISION : DE 230 KV SABANITAS- PANAMA II I Y SUBESTACIONES ASOCIADAS ACCORDING TO CONTRACT 034/000 1-001-2021 OF THE 29TH OF NOVE MB ER OF 2021. DELIVERY TERM S: CIF MANZANILLO IN PANAMA BOOKING NO : 226605281 TRHU1 139936, S.B - 9209021, DT-11.0 4.2023 MSKU5529163, S.B - 920 9019, DT-11.04.2023 MSKU40588 34, S.B - 9209020, DT-11.04.20 23 MRSU0040057, S.B - 9215142 , DT-11.04.2023 MRKU9759650, S.B - 9215143, DT-11.04.2023 MRKU6785147, S.B - 9238956, DT -12.04.2023 SUDU1392517, S.B - 9276176, DT-13.04.2023 MRKU 9214347, S.B - 9246154, DT-12. 04.2023 MRKU8707903, S.B - 92 76156, DT-13.04.2023 MSKU3381 858, S.B - 9351049, DT-17.04.2 023 MRKU7495538, S.B - 935105 7, DT-17.04.2023 MSKU3724221, S.B - 9351054, DT-17.04.2023 MAEU6962117, S.B - 9399401, D T-19.04.2023 MSKU2433160, S.B - 9458101, DT-21.04.2023 MSK U2446506, S.B - 9463086, DT-21 .04.2023 MSKU2803075, S,B - 9 504288, DT-24.04.2023 PONU035 4165, S.B - 9567766, DT-26.04. 2023 MSKU2276924, S.B - 97046 06, DT-02.05.2023 BOOKIN G NO : 226605256 MRKU0918730, S.B - 9238946, DT-12.04.2023 MRKU0717736, S.B - 9249973, D T-12.04.2023 MRKU0581249, S.B - 9424222, DT-20.04.2023 PON U1686987, S.B - 9585817, DT-27 .04.2023 HS CODE: 7308.20.1 1 LC NO. 5494BTY292300 , DT. 22/03/2022. TOTAL NET WEIGHT : 488.007 MT TOTAL GROSS WEIG HT: 495.761 MT TOTAL PACKAGES : 1146
2023-06-23 MAEU228044016 AGRUPACION SABANITAS PANAMA 25080.0 kg 730820 LATTICE STEEL TOWERS INTENDED FOR THE DEVELOPMENT OF THE PRO JECT SUMINI STRO, MONTAJE, OBRAS CIVILES Y PUESTA EN OP ERACION PARA LA CONSTRUCCION D E LA LINEA DE TRANSMISION : DE 230 KV SABANITAS- PANAMA II I Y SUBESTACIONES ASOCIADAS ACCORDING TO CONTRACT 034/000 1-001-2021 OF THE 29TH OF NOVE MB ER OF 2021. DELIVERY TERM S: CIF MANZANILLO IN PANAMA BOOKING NO : 226605281 TRHU1 139936, S.B - 9209021, DT-11.0 4.2023 MSKU5529163, S.B - 920 9019, DT-11.04.2023 MSKU40588 34, S.B - 9209020, DT-11.04.20 23 MRSU0040057, S.B - 9215142 , DT-11.04.2023 MRKU9759650, S.B - 9215143, DT-11.04.2023 MRKU6785147, S.B - 9238956, DT -12.04.2023 SUDU1392517, S.B - 9276176, DT-13.04.2023 MRKU 9214347, S.B - 9246154, DT-12. 04.2023 MRKU8707903, S.B - 92 76156, DT-13.04.2023 MSKU3381 858, S.B - 9351049, DT-17.04.2 023 MRKU7495538, S.B - 935105 7, DT-17.04.2023 MSKU3724221, S.B - 9351054, DT-17.04.2023 MAEU6962117, S.B - 9399401, D T-19.04.2023 MSKU2433160, S.B - 9458101, DT-21.04.2023 MSK U2446506, S.B - 9463086, DT-21 .04.2023 MSKU2803075, S,B - 9 504288, DT-24.04.2023 PONU035 4165, S.B - 9567766, DT-26.04. 2023 MSKU2276924, S.B - 97046 06, DT-02.05.2023 BOOKIN G NO : 226605256 MRKU0918730, S.B - 9238946, DT-12.04.2023 MRKU0717736, S.B - 9249973, D T-12.04.2023 MRKU0581249, S.B - 9424222, DT-20.04.2023 PON U1686987, S.B - 9585817, DT-27 .04.2023 HS CODE: 7308.20.1 1 LC NO. 5494BTY292300 , DT. 22/03/2022. TOTAL NET WEIGHT : 488.007 MT TOTAL GROSS WEIG HT: 495.761 MT TOTAL PACKAGES : 1146
2023-05-24 FJLAJF04SEH06105 CITY OF SANTA CLARA PURCHASING CITY HALL 6150.0 kg 950611 GALVANIZED STEEL POLES AND ACCESSORIES
2023-04-15 FJLAJF04SEH05985 6610 55 60091.0 kg 842620 GALVANIZED TOWER AND ACCESSORIES GALVANIZED TOWER AND ACCESSORIES GALVANIZED TOWER AND ACCESSORIES
2023-01-18 HLCUMA3221127165 6610 55 11520.0 kg 730890 GALVANIZED MONOPOLESAND ACCESSORIES 1X40FLAT CONTAINER GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT. 11500.00 KGS TOTAL GROSS WT .11520.00 KGS TOTAL NO. OF PACKAGES 2 SB NO. 5326163 DATE 8-NOV-22 FREIGHT PREPAID
2023-01-18 HLCUMA3221119460 6610 55 183480.0 kg 730890 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278Z.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 FREIGHT PREPAID GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22 GALVANIZED MONOPOLES 26X40HC CONTAINERS GALVANIZED MONOPOLES AND ACCESSORIES PURCHASE ORDER 1300018302 DDP CANADA DETAILS AS PER PACKING LIST PLACE OF DELIVERY PETRO-CANADA, 100 AVE, ALBERTA T0P1C0 IEC NO. 0294006109 HS CODE NO.7308.90.70 TOTAL NET WT.181278.00 KGS TOTAL GROSS WT.183480.00 KGS TOTAL NO. OF PACKAGES 100 SHIPPING BILL NO & DATE SB NO. 5446774 DATE 14-NOV-22 SB NO. 5470706 DATE 15-NOV-22 SB NO. 5492614 DATE 16-NOV-22 SB NO. 5555055 DATE 18-NOV-22
2022-12-17 FJLAJF04SEH05226 6610 55 23540.0 kg 871420 GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES
2022-12-17 FJLAJF04SEH05106 6610 55 52940.0 kg 871420 GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES
2022-11-18 FJLAJF04SEH04985 6610 55 58990.0 kg 871420 GALVANIZED MONOPOLES AND ACCESSORIES GALVANIZED MONOPOLES AND ACCESSORIES GALVANIZED MONOPOLES AND ACCESSORIES GALVANISED MONOPOLES AND ACCESSORIES GALVANIZED MONOPOLES AND ACCESSORIES
2022-01-09 CMDUAMC1582243 IPA INTERMOUNTAIN POWER AGENCY 3696.0 kg 730820 ------------ TCKU9980057 DESCRIPTION---------1 X 45HC TOTAL 9 PACKAGES GALVANIZED STEEL STRUCTURE SB NO:5240585 SB DATE:11/11/2021 HS CODE:73082011 NET WEIGHT :3452.00 KGS FREIGHT PREPAID CMA-CGM NVOCC HOUSE BILLS CROSS REFERECNE WI MASTER BILLS NO. AMC1565484 -------------GENERIC DESCRIPTION-------------
2021-12-24 MOSJMUMLGB200014 IPA INTERMOUNTAINS POWER AGENCY 98691.0 kg 730820 GALVANIZED STEEL STRUCTURE HS CODE-73082011 GALVANIZED STEEL STRUCTURE HS CODE-73082011 GALVANIZED STEEL STRUCTURE HS CODE-73082011 GALVANIZED STEEL STRUCTURE HS CODE-73082011 GALVANIZED STEEL STRUCTURE HS CODE-73082011 GALVANIZED STEEL STRUCTURE HS CODE-73082011
2021-12-02 MEDUMW418641 TRINIDAD AND TOBAGO ELECTRICITY COM LP 42031.0 kg 730820 HOT DIPPED GALVANIZED STEEL STRUCTURES (TOWERS) - HOT DIPPED GALVANIZED STEE L STRUCTURES (TOWERS) HOT DIPPED GALVANIZED STEEL STRUCTURES (TOWERS) - 311 PACKAGES CONTAINING HO T DIPPED GALVANIZED STEEL STRUCTURES (TOWERS) INCLUD ING ITS ASSOCIATED BOLTS, NUTS, WASHERS, PRESSURE WA SHERS, STEP BOLTS, ANTI-CL IMBING SPIKES AND TAMPER R ESISTANT NUTS ACCORDING TO THE TECHNICAL SPECS FOR P ROJECT TT250-CONTRACT NO. 19034 AND DETAILS DRAWINGS . SHIPPED ON BOAR D FREIGHT PREPAID = ATT: MR S LATCH MEPERSAD (TD&ES) ==PHONES : 1-868-640-8961/8163 MOBI LE: +1-868-791-4524 454687 6 13-SEP-21 454692713-SEP -21 HS CODE NO. 7308.20.11 TOTAL NET WT 40943.00 KGS
2021-06-01 NAQA321411000296 IPA INTERMOUTAIN POWER AGENCY 2402.0 kg 731700 GALVANIZED STEEL STRUCTURE S.BILL 9635219
2021-04-07 MAEU207669234 ELECNOR CHILE S A 335254.85 kg 730820 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11 1745 PACKAGES CONTAINING STE EL TOWERS AND STRUCTURES I NTENDED FOR THE CONSTRUCTION O F THE TRANSMISSION LINE PRO JECT GRUPO 1 Y GRUPO 3, AC CORDING TO THE STEEL STRUC TURES SUPPLY AGREEMENT 90. 0017/19-002 OF DECEMBER 13T H, 2019, CODIGO ARANCELARIO 73 0820 INCOTERMS 2010 CIF CORONEL PORT, CHILE 79777 01 18-JAN-21 7980868 1 8-JAN-21 8007673 19-JAN-21 8 010640 19-JAN-21 8111572 23-JAN-21 8122778 23-JAN-21 SHIPPED ON BOA RD FREIGHT PREPAID LC NO . CI86283100316933 , DATE 26/ 02/2020. 21 DAYS FREE DETE NTION AT DESTINATION PORT TO TAL NET WT : 331933.00 KGS HS CODE NO. 7308.20.11
2021-03-26 MAEU207522746 BANDTEL S A 75815.61 kg 730820 -- [email protected] TOR RES DE TELECOMUNICATIONES PARA S/B NO S/B DT 7742968 7 -JAN-21 7743009 7-JAN-21 778 1172 8-JAN-21 7781168 8-JAN-2 1 GROSS WT:75.815 MT NET.WT: 72.312 MT TOTAL PACKAGE:240 IEC NO:0294006109 HS CODE NO . 7308.20.19 PURCHASE ORDER N O. 005-2020/BANDTEL-PASCO-HUAN UCO , DT. 27/01/2020. APP LICABLE FREE TIME 14 DAYS COMB INED(DETENTION & DEMURRAGE) AT (PORT OF DISCHARGE / PLACE OF DELIVERY) -- [email protected] TOR RES DE TELECOMUNICATIONES PARA S/B NO S/B DT 7742968 7 -JAN-21 7743009 7-JAN-21 778 1172 8-JAN-21 7781168 8-JAN-2 1 GROSS WT:75.815 MT NET.WT: 72.312 MT TOTAL PACKAGE:240 IEC NO:0294006109 HS CODE NO . 7308.20.19 PURCHASE ORDER N O. 005-2020/BANDTEL-PASCO-HUAN UCO , DT. 27/01/2020. APP LICABLE FREE TIME 14 DAYS COMB INED(DETENTION & DEMURRAGE) AT (PORT OF DISCHARGE / PLACE OF DELIVERY) -- [email protected] TOR RES DE TELECOMUNICATIONES PARA S/B NO S/B DT 7742968 7 -JAN-21 7743009 7-JAN-21 778 1172 8-JAN-21 7781168 8-JAN-2 1 GROSS WT:75.815 MT NET.WT: 72.312 MT TOTAL PACKAGE:240 IEC NO:0294006109 HS CODE NO . 7308.20.19 PURCHASE ORDER N O. 005-2020/BANDTEL-PASCO-HUAN UCO , DT. 27/01/2020. APP LICABLE FREE TIME 14 DAYS COMB INED(DETENTION & DEMURRAGE) AT (PORT OF DISCHARGE / PLACE OF DELIVERY) -- [email protected] TOR RES DE TELECOMUNICATIONES PARA S/B NO S/B DT 7742968 7 -JAN-21 7743009 7-JAN-21 778 1172 8-JAN-21 7781168 8-JAN-2 1 GROSS WT:75.815 MT NET.WT: 72.312 MT TOTAL PACKAGE:240 IEC NO:0294006109 HS CODE NO . 7308.20.19 PURCHASE ORDER N O. 005-2020/BANDTEL-PASCO-HUAN UCO , DT. 27/01/2020. APP LICABLE FREE TIME 14 DAYS COMB INED(DETENTION & DEMURRAGE) AT (PORT OF DISCHARGE / PLACE OF DELIVERY)
2021-03-14 MAEU207669090 ELECNOR CHILE S A 450089.14 kg 730820 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11 STEEL TOWERS AND STRUCTURES INTENDED FOR THE CONSTRUCTIO N OF THE TRANSMISSION LINE PROJECT GRUPO 1 Y GRUPO 3, ACCORDING TO THE STEEL ST RUCTURES SUPPLY AGREEMENT 90.0017/19-002 OF DECEMBER 13TH, 2019, CODIGO ARANCELARIO 730820 INCOTERMS 2010 C IF CORONEL PORT, CHILE 78 57646 12-01-21 7890374 13-01- 21 7890368 13-01-21 7890393 13-01-21 7909301 14-01-21 79 07665 14-01-21 7909284 14-01- 21 7907666 14-01-21 7907641 14-01-21 7925365 15-0 1-21 7925350 15-01-21 792535 1 15-01-21 7925358 15 -01-21 7951742 16-01- 21 7951087 16-01-21 7952108 16-01-21 7951725 16- 01-21 7980787 18-01-21 79777 02 18-01-21 NET WEI GHT : 447174.00 KGS SHIPPED ON BOARD FREIGHT PREPAID LC NO. CI86283100316933 , DA TE 26/02/2020. 21 DAYS FRE E DETENTION AT DESTINATION POR T HS CODE NO. 7308.20.11
2021-02-28 MAEU206618752 BANDTEL S A 768657.41 kg 940430 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20 TORRES DE TELECOMUNICATIONES P ARA TOTAL NET . WT: 761589.0 0 KGS TOTAL GROSS WEIGHT : 76 8651.00 KGS TOTAL PKG : 5357 FREIGHT AS PER AGREEMENT SB NO. & DATE . 6709939 , 23-NOV-20 , 6710968 ,23-NOV- 20 ,6709969,23-NOV-2 0 , 6734 316, 24-NOV-20 , 6755848, 25-N OV-20, 6755843,25-NOV-20, 678 8772, 26-NOV-20 , 6785159, 26 -NOV-20 , 6788601,26-NOV-20 , 6788571, 26-NOV-20 , 6814036 , 27-NOV-20, 6810935,27-NOV-2 0 , 6815585 ,27-NOV-20,6814543 , 27- NOV-20, 6810957,27-NOV -20, 6814747, 27-NOV-20 , 6841 321,28-NOV-20 ,68415 25, 28-N OV-20 , 6841604 ,28-NOV-20, 68 42328, 28-NOV-20, 6841242, 28- NOV-2 0 , 6859914 ,30-NOV-20 , 6859834,30-NOV20, 6902627,1- DEC-20 , 6906261, 1 -DEC-20, 6907697, 1-DEC-20 , 6906251, 1-DEC-20 ,6907692, 1-DEC-20 , 69044 49 ,1-DEC-20 ,6929102,2 -DEC-20 , 6983641, 4-DEC-20, 7 044146 ,7-DEC-20
Contact information Request
to request contact information.
Other address
3A LOUDON STREET IST FLOOR KOLKATA WB 700017 INDIA
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA
3A LOUDON ST KOLKATA 700017
3A LOUDON STREET 1ST FLOOR
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA TEL 033 2289 2327 FAX 033 2289 5733
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA TEL : 033 2289 2327 FAX : 033 2289
3A LOUDON STR 1ST FLR
3A LOUDON STREET 1ST FLOOR KOLKAT A - 700 017 INDIA TEL 033 2289 2327 FAX 033 2289 5733 70001
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA TEL : 03 IEC NO : 0294006109
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA TEL:0332289 2327 FAX:033 2289 5733
3A LOUDON STREET 1ST FLOOR KOLKATA - 700 017 INDIA TEL:03322892327 FAX:03322895733
3A LOUDON STREET 1ST FLOOR KOLKATA INDIA
3A LOUDAN STREET 1ST FLOOR KOLKATA WEST BENGAL 700017
3A LOUDON STREET 1ST FLOOR