Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.17 | Average TEU per month: 0.50 |
Active Months: 2 | Average TEU per Shipment: 3.00 |
Shipment Frequency Std. Dev.: 0.39 |
Company Name | Shipments |
---|---|
OXBOW GREENWOOD LLC | 3 shipments |
HS Code | Shipments |
---|---|
380520 Gum, wood or sulphate turpentine, other terpenic oils; crude dipentene; sulphite turpentine, other crude para-cymene; pine oil containing alpha-terpineol as the main constituent | 1 shipments |
730459 Steel, alloy (not stainless steel); (excluding cold-drawn or cold-rolled), tubes, pipes and hollow profiles of circular cross-section | 1 shipments |
847920 Machinery; for the extraction or preparation of animal or fixed vegetable fats or oils | 1 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2024-03-07 | HLCUBO12401BOHZ3 | OXBOW GREENWOOD LLC | 19370.0 kg | 847920 | FIRST STAGE EVAPORATOR 2 X 40 OPEN TOP CONTAINING 8 PACKAGES (1) FIRST STAGE EVAPORATOR 600M2 E8-60 (2) SS MISCELLA TANK E21-17 (3) SS OIL DRYER E5A-22B (4) SS DESORBER COLOUMN PART I E25-122 (5) SS DESORBER COLOUMN PART II E25-122 (6) SS ABSORBER COLOUMN PART I E24-120 (7) SS ABSORBER COLOUMN PART II E24-120 HS CODE 84792090 SB N 6150281 DTD 19.12.2023 NET WT 19360.00 KGS FREIGHT PREPAID FIRST STAGE EVAPORATOR 2 X 40 OPEN TOP CONTAINING 8 PACKAGES (1) FIRST STAGE EVAPORATOR 600M2 E8-60 (2) SS MISCELLA TANK E21-17 (3) SS OIL DRYER E5A-22B (4) SS DESORBER COLOUMN PART I E25-122 (5) SS DESORBER COLOUMN PART II E25-122 (6) SS ABSORBER COLOUMN PART I E24-120 (7) SS ABSORBER COLOUMN PART II E24-120 HS CODE 84792090 SB N 6150281 DTD 19.12.2023 NET WT 19360.00 KGS FREIGHT PREPAID |
2024-02-17 | ALPJNAVSAV01273 | OXBOW GREENWOOD LLC | 18715.0 kg | 730459 | DT CONDENSOR SS 400M2 E11 20B STRIPPER AND RECUPERATION CONDENSOR SS 200 M2E18 23A MINERAL OIL HEATER 25M2 E27 121 NADI MAKE BLOWER HP 630 WITH MOTOR FLAME ARRESTOR SS PALL RINGS 25MM SECOND STAGE EVAPORATOR SEPERATOR E14 18F FIRST STAGE EVAPORATOR SEPERATOR E10 60F DT CONDENSOR SS 400M2 E11 20B STRIPPER AND RECUPERATION CONDENSOR SS 200 M2E18 23A MINERAL OIL HEATER 25M2 E27 121 NADI MAKE BLOWER HP 630 WITH MOTOR FLAME ARRESTOR SS PALL RINGS 25MM SECOND STAGE EVAPORATOR SEPERATOR E14 18F FIRST STAGE EVAPORATOR SEPERATOR E10 60F |
2023-10-11 | ALPJNAVSAV01235 | OXBOW GREENWOOD LLC | 13553.0 kg | 380520 | SECOND STAGE EVAPORATOR SS HEATER 180M2 E13 18 VENT CONDENSOR SS 200M2 E12 20C MISCELLA OIL HEAT EXCHANGER E5D 81A FINAL OIL COOLER E5D 81B MINERAL OIL HEAT EXCHANGER E26 181A MINERAL OIL COOLER E28 181B KSB PUMP FITTED WITH MECHANICAL SEAL AND COUPLINGS MINERAL OIL STRIPPING COLUMN PUMP MCPK 500 32160 MINERAL OIL ABOSORBER OIL PUMP MCPK 50 32 160STEAM JET EJECTOR VACCUM SYSTEM 41 1 TO 41 4 |