Shipment Reliability and Frequency | Volume of Goods |
---|---|
Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
Active Months: 0 | Average TEU per Shipment: N/A |
Shipment Frequency Std. Dev.: 0.00 |
Company Name | Shipments |
---|---|
HOPEUP INC | 9 shipments |
I&Y TRADE INC | 2 shipments |
HS Code | Shipments |
---|---|
731700 Iron or steel; nails, tacks, drawing pins, corrugated nails, staples (not those of heading no. 8305) and the like, with heads of other material or not, but excluding articles with heads of copper | 11 shipments |
Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
---|---|---|---|---|---|
2023-04-12 | PRIM2DP02013 | I&Y TRADE INC | 97500.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-04-12 | PRIM2DP02019 | I&Y TRADE INC | 59040.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-04-12 | PRIM2DP02011 | HOPEUP INC | 19680.0 kg | 731700 | GALVANIZED WIRE |
2023-03-03 | PRIM2DP02012 | HOPEUP INC | 19680.0 kg | 731700 | GALVANIZED WIRE |
2023-02-06 | PRIM2DP01011 | HOPEUP INC | 97500.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-01-31 | PRIM2DN12029 | HOPEUP INC | 78720.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-01-21 | PRIM2DN12012 | HOPEUP INC | 92000.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-01-21 | PRIM2DN12017 | HOPEUP INC | 92000.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-01-20 | PRIM2DN12015 | HOPEUP INC | 97500.0 kg | 731700 | GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE GALVANIZED WIRE |
2023-01-10 | PRIM2DN12016 | HOPEUP INC | 59040.0 kg | 731700 | GALVANIZED STEEL WIRE GALVANIZED STEEL WIRE GALVANIZED STEEL WIRE |
2022-12-29 | PRIM2DN12013 | HOPEUP INC | 19680.0 kg | 731700 | GALVANIZED STEEL WIRE |