TONGLING SANYUAN MACHINERY MANUFACT PLANT
TONGLING SANYUAN MACHINERY MANUFACT PLANT's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.08 Average TEU per month: 0.08
Active Months: 1 Average TEU per Shipment: 1.00
Shipment Frequency Std. Dev.: 0.29
Shipments By Companies
Company Name Shipments
NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 5 shipments
NOV PROCESS & FLOW TECHNOLOGIES US EAST DOCK PFT/EAST SIDE BAY 3 shipments
FLOW TECHNOLOGY INC 1 shipments
NOV PROCESS & FLOW TECHNOLOGIES 1 shipments
NOV PROCESS AND FLOW TECHNOLOGIES D 1 shipments
Shipments By HS Code
HS Code Shipments
660191 Umbrellas and sun umbrellas; having a telescopic shaft, (excluding garden or similar umbrellas) 3 shipments
848330 Bearing housings, not incorporating ball or roller bearings and plain shaft bearings 2 shipments
231643 1 shipments
820411 Tools, hand; hand-operated spanners and wrenches (including torque meter wrenches but not including tap wrenches), non-adjustable 1 shipments
841231 Engines; pneumatic power engines and motors, linear acting (cylinders) 1 shipments
870850 Vehicle parts; drive-axles with differential, whether or not provided with other transmission components, and non-driving axles; parts thereof 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2024-09-22 NAQAGHOU4414424V NOV PROCESS AND FLOW TECHNOLOGIES D 777.0 kg 848330 SPLIT COUPLING ROD ROTOR SIDE ABUTMENT RING ST STL 55MM DIA COUPLING ROD PKGGLD A1F 316SS B06261 Y DRIVE SHAFT SLEEVE ROTOR SHAFT SPLIT COUPLING ROD ROTOR SIDE DRVSFT L6 316SS DRVSFT 300SERIES 316SS 4FI BRGSPA FRM8 DRVSFT A1F ALYSTL S316 DRVSFT L4 316SS DRVSFTASY E G1 316SS NPL DRVSFT L8 316SS DRVSFT L2 CBNSTL DRVSFT L8 ALYSTL
2022-09-17 DFDSSHA7969922 NOV PROCESS & FLOW TECHNOLOGIES 986.0 kg DRVSFTDRVSFTASYDRVSFTHEDCONROD
2022-09-06 DFDSSHA7958941 NOV PROCESS & FLOW TECHNOLOGIES US EAST DOCK PFT/EAST SIDE BAY 1368.0 kg 841231 DRVSFTASY DRVSFTROTPIN L2,D2TOOSTL,NONPLTS FTCOL L3ABUTMENT RING GLAND SECTIONCOUPLING ROD
2022-09-04 DFDSTAD81365311 NOV PROCESS & FLOW TECHNOLOGIES US EAST DOCK PFT/EAST SIDE BAY 325.0 kg 660191 DRIVE SHAFT HCP DRVPIN L3,D2TOOSTL ,NONPLT DRIVE SHAFT SPL IT COUPLING ROD(ROTOR SIDE) SLEEVE (ROTOR-SHAFT) DRVPIN L10,A2TOOSTL, NONPLT DRVPIN L2,D2TOOLSTL,NONPLT SHAFT PIN
2022-08-13 DFDSTAD81362842 NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 758.0 kg 848330 DRVSFTSLEEVE(ROTOR-SHAFT)DRVSFTASY COUPLING ROD PINBRGSPASFTCOL L6DRIVE SHAFTROTPIN L6,A 2TOOSTL,NONPLTSHAFT PIN S.S.COUPLING ROD SLEEVESCONROD L4,316SS
2022-08-13 DFDSTAD81361247 NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 1152.0 kg 820411 COUPLING END EZ STRIPDRVSFTDRVSFTHED HSIZE,CBNSTLDRVSFTASY
2022-08-03 DFDSTAD81356402 NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 599.0 kg 660191 DRVSFTASYDRVSFTSYDRVPINDRIVE SHAFT
2022-07-30 DFDSCTU7008410 NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 877.0 kg DRVPIN L10,A2TOOSTL,NONPLT
2022-07-10 DFDSNGB7216489 FLOW TECHNOLOGY INC 2747.0 kg 660191 DRIVE SHAFT
2022-06-27 DFDSNGB81344993 NOV PROCESS & FLOW TECHNOLOGIES US FMS EAST DOCK 495.0 kg 231643 ROTPIN L10,A2TOOLST.NONPLT 316SS D RIVE SHAFT COUPLING ROD SLEEVES SELHSG A2A,316,43&680CC A BUTMENT RING ST. STL 32MM DIA CONR OD L3,316SS CONROD L10,316SS GLAND SECTION
2022-05-22 DFDSTAD81337394 NOV PROCESS & FLOW TECHNOLOGIES US EAST DOCK PFT/EAST SIDE BAY 502.0 kg 870850 DRVSFT A1F,ALYSTL COUPLING ROD PIN BRGSPA FRM 6 DRIVE SHA FT C012 DRIVE SHAFT DRV SFTASY L12, CBNSTL
Contact information Request
to request contact information.
Other address
3 18 NO 4201 CUIHU 6TH ROAD W