WATLOW ELECTRIC MANUFACTURING SHAN
WATLOW ELECTRIC MANUFACTURING SHAN's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.41 Average TEU per month: 1.25
Active Months: 6 Average TEU per Shipment: 2.14
Shipment Frequency Std. Dev.: 0.62
Shipments By Companies
Company Name Shipments
CAST ALUMINUM SOLUTIONS 13 shipments
CAST ALUMINUM SOLUTIONS LLC 6 shipments
WATLOW ELECTRIC MANUFACTURING COMPA 2 shipments
Shipments By HS Code
HS Code Shipments
730630 Iron or non-alloy steel (excluding cast iron); tubes and pipes (not seamless), welded, of circular cross-section, n.e.c. in chapter 73 14 shipments
830820 Rivets; tubular or bifurcated, of base metal 4 shipments
843790 Machines; parts of those for cleaning, sorting or grading seed, grain or dried leguminous vegetables or for milling or working cereals or dried leguminous vegetables (not farm-type machinery) 1 shipments
851610 Heaters; electric, instantaneous or storage water and immersion heaters 1 shipments
981800 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2024-09-09 CHSL484395877PVG CAST ALUMINUM SOLUTIONS LLC 3884.0 kg 730630 HEATER
2024-05-22 CHSL473179170PVG CAST ALUMINUM SOLUTIONS LLC 6636.0 kg 730630 HEATER
2024-03-18 CHSL463868681PVG CAST ALUMINUM SOLUTIONS LLC 1177.0 kg 730630 HEATER
2024-02-08 RXIFREX793230559 WATLOW ELECTRIC MANUFACTURING COMPA 23820.0 kg 981800 DUCT FRAME,PURCHASED - ZONE SPARE PARTS KIT -ZONE DUCT FRAME,PURCHASED - ZONE SPARE PARTS KIT -ZONE DUCT FRAME,PURCHASED - ZONE SPARE PARTS KIT -ZONE
2024-01-07 CWQGNPT231176045 WATLOW ELECTRIC MANUFACTURING COMPA 28729.0 kg 843790 DUCT FRAME,PURCHASED-MILL & ROCK SPARE PARTS KIT -ROCK&MILL DUCT FRAME,PURCHASED-MILL & ROCK SPARE PARTS KIT -ROCK&MILL DUCT FRAME,PURCHASED-MILL & ROCK SPARE PARTS KIT -ROCK&MILL
2023-11-21 CHSL452502006PVG CAST ALUMINUM SOLUTIONS LLC 5082.0 kg 730630 HEATER
2023-11-03 CHSL449963737PVG CAST ALUMINUM SOLUTIONS 2348.0 kg 730630 HEATER
2023-09-25 CHSL446433293PVG CAST ALUMINUM SOLUTIONS 1195.0 kg 830820 TUBULAR HEATER
2023-06-20 CHSL436679271PVG CAST ALUMINUM SOLUTIONS 1339.0 kg 730630 HEATER
2023-04-21 CHSL430687129PVG CAST ALUMINUM SOLUTIONS 9910.0 kg 730630 HEATER
2023-01-26 CHSL419809891PVG CAST ALUMINUM SOLUTIONS 10110.0 kg 730630 HEATER
2023-01-12 CHSL419168763PVG CAST ALUMINUM SOLUTIONS 9497.0 kg 730630 HEATER
2022-11-14 CHSL413524993PVG CAST ALUMINUM SOLUTIONS 3125.0 kg 730630 HEATER
2022-02-03 CHSL380951028PVG CAST ALUMINUM SOLUTIONS 8823.0 kg 851610 HEATERS
2021-12-12 CHSL373400639PVG CAST ALUMINUM SOLUTIONS 2179.0 kg 830820 HEATER TUBULAR HEATER
2021-11-03 CHSL369631408PVG CAST ALUMINUM SOLUTIONS LLC 3765.0 kg 830820 HEATER TUBULAR HEATER
2021-08-26 CHSL362952944PVG CAST ALUMINUM SOLUTIONS 2270.0 kg 830820 TUBULAR HEATER
2021-07-31 CHSL360422693PVG CAST ALUMINUM SOLUTIONS 1220.0 kg 730630 HEATER
2021-07-27 CHSL359738485PVG CAST ALUMINUM SOLUTIONS LLC 2306.0 kg 730630 HEATER
2021-03-28 CHSL347919356PVG CAST ALUMINUM SOLUTIONS 2461.0 kg 730630 HEATER
2021-02-26 CHSL346881775PVG CAST ALUMINUM SOLUTIONS 1875.0 kg 730630 HEATER
Contact information Request
to request contact information.
Other address
BUILDING 5 NO 358 SHENXIA ROAD MALU TOWN JIADING DISTRICT
BUILDING 5 NO 358 SHENXIA ROAD MA LU TOWN JIADI SHANGHAI CN
BUILDING NO 5 NO 358 SHENXIA ROAD MALU TOWN JIADING DISTRICT SHANGHAI CN